<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>International Center for EMECS &#187; COMPUTATIONAL RISK ASSESSMENT FOR NEARSHORE MARITIME STRUCTURES (CASE STUDIES FOR FLOOD WARNING SYSTEM IN ST. PETERSBURG)｜International Center for Environmental Management of Enclosed Coastal Seas</title>
	<atom:link href="https://www.emecs.or.jp/en/tag/lopatoukhin-leonid/feed" rel="self" type="application/rss+xml" />
	<link>https://www.emecs.or.jp/en</link>
	<description>he International EMECS Center is an organization established for promoting international exchanges on not only coastal but also catchment areas of the enclosed coastal seas in a wide range of fields such as research, policy, civic action, education and industrial activities and so forth to solve the problem on the environmental conservation of enclosed coastal seas in the world such as the Seto Inland Sea (Japan), the Chesapeake Bay (USA), the Baltic Sea (Northern Europe), and the Mediterranean Sea (Southern Europe).</description>
	<lastBuildDate>Tue, 13 Oct 2026 01:11:46 +0000</lastBuildDate>
	<language>ja</language>
		<sy:updatePeriod>hourly</sy:updatePeriod>
		<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=4.0.1</generator>
	<item>
		<title>COMPUTATIONAL RISK ASSESSMENT FOR NEARSHORE MARITIME STRUCTURES (CASE STUDIES FOR FLOOD WARNING SYSTEM IN ST. PETERSBURG)</title>
		<link>https://www.emecs.or.jp/en/emecs11-conference/emecs11-07/11-7-18</link>
		<comments>https://www.emecs.or.jp/en/emecs11-conference/emecs11-07/11-7-18#comments</comments>
		<pubDate>Sun, 21 Aug 2016 15:00:58 +0000</pubDate>
		<dc:creator><![CDATA[owner@emecs_or_jp]]></dc:creator>
				<category><![CDATA[Coastal systems and their dynamics (from coast to water and from water to coast)]]></category>
		<category><![CDATA[Boukhanovsky, Alexander]]></category>
		<category><![CDATA[Kalyuzhnaya, Anna]]></category>
		<category><![CDATA[Lopatoukhin, Leonid]]></category>

		<guid isPermaLink="false">https://www.emecs.or.jp/en/?p=515</guid>
		<description><![CDATA[National Research University of Information Technologies, Mechanics and Optics COMPUTATIONAL RISK ASSESSMENT F [&#8230;]]]></description>
				<content:encoded><![CDATA[<p>National Research University of Information<br />
Technologies, Mechanics and Optics<br />
COMPUTATIONAL RISK ASSESSMENT<br />
FOR NEARSHORE MARITIME<br />
STRUCTURES<br />
(CASE STUDIES FOR FLOOD WARNING SYSTEM IN<br />
ST. PETERSBURG)<br />
Leonid Lopatoukhin,<br />
Anna Kalyuzhnaya,<br />
Alexander Boukhanovsky<br />
EMECS 11 Sea coasts XXVI,<br />
St. Petersburg, Russia.<br />
Aug. 22-27.<br />
Short History (историческая справка)<br />
• 1703 – 2011: 309 floods<br />
• The highest (Крупнейшие наводнения):<br />
&#8211; 21 сентября 1777 года (3,21 м)<br />
&#8211; 19 ноября 1824 года (4,21 м)<br />
&#8211; 23 сентября 1924 года (3,80 м)<br />
• About 70 % are at Autumn.<br />
• May be the flood up to 5,4 m. (Возможны наводнения с подъемом<br />
уровня воды до 5,4 м).<br />
Садовая<br />
улица во<br />
время<br />
наводнения<br />
1903 г</p>
<p>http://www.nevariver.ru/index.php</p>
<p>Objects at risk &#8211; city center<br />
The floods in XVIII century<br />
1724<br />
(211 sm)<br />
1777<br />
(321 sm)<br />
The flood in XIX century<br />
1824<br />
(421 sm)<br />
The flood in XX century<br />
1924<br />
(380 sm)<br />
History of floods in St. Petersburg<br />
St. Petersburg, Russia. Aug. 22-27<br />
.<br />
7<br />
1724<br />
(211 cm)<br />
1777<br />
(321 cm)<br />
1824<br />
(421 cm)<br />
1924<br />
(380 cm)<br />
Катастрофическое наводнение 23 сентября 1924 (380 см)<br />
Catastrophic Flood 23 September 1924<br />
Backgrounds: nature of flood<br />
The most dangerous<br />
situation with strong<br />
western winds<br />
Cyclone propagation<br />
St. Petersburg, Russia.. Aug. 22-27<br />
.<br />
9<br />
Backgrounds: flood statistics<br />
 <br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
  <br />
0<br />
0<br />
( ) 1 exp<br />
m h<br />
h h<br />
P h<br />
h<br />
where h – flood heights, &#8211;<br />
threshold level, =192,4 cm &#8211;<br />
mean flood level.  <br />
n<br />
P(n)  1 <br />
where n – number of floods<br />
per year and<br />
 1 P(0)<br />
• Distribution of floods per year<br />
• Distribution of flood heights<br />
Geometrical distribution:<br />
Two-parameter exponential distribution:<br />
0<br />
h<br />
mh<br />
St. Petersburg, Russia. Aug. 22-27 26.10.2017 10<br />
11<br />
Number of flooded<br />
buildings<br />
GIS portal: http://www.infoecogis.ru/<br />
Flood damage estimation using GIS<br />
St. Petersburg, Russia. Aug. 22-27 11<br />
12<br />
Damage function:<br />
 <br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
  <br />
0<br />
0<br />
( ) 1 exp<br />
m h<br />
h h<br />
P h<br />
h<br />
Probability function:<br />
Flood risk assessment function<br />
St. Petersburg, Russia. Aug. 22-27 12<br />
Max risk: peak heights about 200 sm and level rising speed about 20 sm/hour<br />
Прогнозирование невских наводнений.<br />
Floods forecast in St. Petersburg<br />
13<br />
Формула Фрэйдзона-Бельского:<br />
СПб Tл ветер H  2.5 H  h<br />
Система г/д уравнений<br />
модели BSM-2010 в двумерной<br />
постановке:<br />
Сетка модели BSM-2010:<br />
Fragment of grids in BSM5 (top)<br />
and in BSM6 (bottom) in the Baltic<br />
Proper, Moonzund and Aland<br />
Archipelagoes<br />
Фрагменты расчетной сетки в BSM5<br />
(вверху) и BSM6 (внизу) в<br />
центральной части Балтики и в<br />
районах Моонзундского и<br />
Аланского архипелагов<br />
15<br />
Прогноз уровня и течений: модель<br />
Гидрометцентра России<br />
Трехмерная<br />
бароклинная модель<br />
динамики водных<br />
масс<br />
Три вложенных<br />
ортогональных<br />
сетки, около 1 млн.<br />
ячеек<br />
Прямое задание<br />
граничных условий<br />
(уровень воды)<br />
 .<br />
    <br />
 <br />
n<br />
i<br />
m<br />
j n<br />
i i j j<br />
Y t a X t a F t<br />
1 1<br />
( ) ( ) ( )<br />
Ensemble<br />
forecast<br />
UNCERTAINTY MANAGEMENT IN ST. PETERSBURG<br />
FLOOD PREVENTION SYSTEM<br />
Детерминированный<br />
прогноз Deterministic<br />
Неопределённос<br />
ть<br />
Входных данных<br />
Входная<br />
информация<br />
Ансамблевый<br />
прогноз<br />
Климатологическа<br />
я оценка<br />
Climatology<br />
estimate<br />
Initial conditions<br />
uncertainty<br />
input<br />
Ensemble forecast<br />
Cloud of Uncertainty<br />
18<br />
Метеопрогноз А<br />
Метеопрогноз В<br />
Метеопрогноз Z<br />
…<br />
Модель Z<br />
Модель А<br />
Модель В<br />
Усвоение<br />
Х<br />
Усвоение А<br />
Ансамблевый<br />
прогноз<br />
Ensemble<br />
forecast<br />
…<br />
…<br />
 Бухановский А.В. 14 ноября 2013 г.<br />
Прогрессирующая неоднородность<br />
«проклятие» ансамблевых методов<br />
Flood Warning System (FWS)<br />
Shallow water equations:<br />
St. Petersburg, Russia.. Aug. 22-27 26.10.2017 19<br />
Mathematical model component<br />
associated with a sources of<br />
uncertainty:<br />
• Input data<br />
• Model structure<br />
• Model parameters<br />
• Initial conditions<br />
• Boundary conditions<br />
• Output data<br />
Uncertainty in mathematical model<br />
UNCERTAINTY MANAGEMENT IN ST. PETERSBURG<br />
FLOOD PREVENTION SYSTEM<br />
Dealing with uncertainty<br />
Elimination of systematic “shift”<br />
• model calibration methods<br />
• statistical correction methods<br />
Reducing of random error<br />
• data assimilation methods<br />
• ensemble forecasting methods<br />
Evaluation and control of residual error<br />
• interval and ensemble assessment<br />
• related risks assessment<br />
UNCERTAINTY MANAGEMENT IN ST. PETERSBURG<br />
FLOOD PREVENTION SYSTEM<br />
Uncertainty management – affection on input data,<br />
parameters and model structure for:<br />
Multistage<br />
data<br />
assimilation<br />
Data assimilation (DA) stages:<br />
A – DA in atmospheric forecast<br />
B – DA in initial and boundary conditions<br />
C – DA in model parameters<br />
D – statistical correction using recent measurements<br />
UNCERTAINTY MANAGEMENT IN ST. PETERSBURG<br />
FLOOD PREVENTION SYSTEM<br />
23<br />
Усвоение (Assimilation) данных в<br />
моделях (1/2):<br />
ассимиляция в начальные условия<br />
ДАМБА (Barrier model)<br />
Flood Protection Barrier<br />
• The overall length &#8211; 25.4 km<br />
• 6 gates for water exchange and 2 navigation passes<br />
C1 shipping<br />
gates<br />
Width ~ 300 m<br />
C2 shipping<br />
gates<br />
Width ~ 150 m<br />
St. Petersburg, Russia.. Aug. 22-27 26.10.2017 25<br />
26<br />
Комплекс защиты Санкт-Петербурга от наводнений (введен в строй в 2011)<br />
FLOOD PROTECTING SYSTEM<br />
Technical characteristics of the barrier system, model forecast an<br />
procedures of plan elaboration add uncertainty in final proposals for making<br />
system decision phase<br />
 Ларнака, 13 мая 2013 г.<br />
27<br />
Цели маневрирования затворами.<br />
Sluice gate maneuvering (Objectives)<br />
1) Закрыть (Close in proper time)<br />
своевременно – предотвратить<br />
затопление города Финским заливом<br />
2) Открыть (Open in proper time)<br />
своевременно – предотвратить<br />
затопление города р. Невой<br />
3) Обеспечить минимальное время (min<br />
time of closing) нахождения в закрытом<br />
состоянии (работа порта)<br />
4) Не повредить (No damage)<br />
оборудование комплекса защитных<br />
сооружений<br />
5) Удовлетворить интересы (various<br />
interest) многочисленных «абонентов»<br />
(ВМБ, МЧС, экологи, городская<br />
администрация и пр.)<br />
30-50<br />
мин<br />
 Бухановский А.В.<br />
90 мин<br />
How to close the gates… in time?<br />
28<br />
CLOSING<br />
OPENING<br />
Sea level must not be greater<br />
then 130 cm during all gates<br />
closing time<br />
Surge<br />
River flow<br />
Forecast of predicted flood<br />
St. Petersburg, Russia.. Aug. 22-27 26.10.2017 28<br />
UNCERTAINTY MANAGEMENT IN ST. PETERSBURG<br />
FLOOD PREVENTION SYSTEM<br />
Problem statement:<br />
flood protection<br />
barrier<br />
UNCERTAINTY MANAGEMENT IN ST. PETERSBURG<br />
FLOOD PREVENTION SYSTEM<br />
Uncertainty management strategies<br />
Flows of uncertainty<br />
initiated by:<br />
1. Atmospheric<br />
forecasts<br />
2. Hydrological models<br />
3. Interactions among<br />
atmospheric and<br />
hydrological models<br />
How to choose the best plan? (1/2)<br />
31<br />
• Risk function for each closed time (maneuvering plan):<br />
• Ensemble risk assessment for maneuvering plan<br />
St. Petersburg, Russia.. Aug. 22-27 26.10.2017 31<br />
Where </p>
]]></content:encoded>
			<wfw:commentRss>https://www.emecs.or.jp/en/emecs11-conference/emecs11-07/11-7-18/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>O047. COMPUTATIONAL RISK ASSESSMENT FOR ST. PETERSBURG FLOOD WARNING SYSTEM</title>
		<link>https://www.emecs.or.jp/en/emecs11-conference/emecs11-ab-02/11-14-2-49</link>
		<comments>https://www.emecs.or.jp/en/emecs11-conference/emecs11-ab-02/11-14-2-49#comments</comments>
		<pubDate>Sun, 21 Aug 2016 15:00:44 +0000</pubDate>
		<dc:creator><![CDATA[owner@emecs_or_jp]]></dc:creator>
				<category><![CDATA[02_Oral presentations]]></category>
		<category><![CDATA[Boukhanovsky, Alexander]]></category>
		<category><![CDATA[Kalyuzhnaya, Anna]]></category>
		<category><![CDATA[Lopatoukhin, Leonid]]></category>

		<guid isPermaLink="false">https://www.emecs.or.jp/en/?p=1136</guid>
		<description><![CDATA[EMECS 11 – Sea Coasts XXVI, August 22-27, 2016, St Petersburg, Russia 56 O47. COMPUTATIONAL RISK ASSESSMENT FO [&#8230;]]]></description>
				<content:encoded><![CDATA[<p>EMECS 11 – Sea Coasts XXVI, August 22-27, 2016, St Petersburg, Russia<br />
56<br />
O47. COMPUTATIONAL RISK ASSESSMENT FOR ST. PETERSBURG<br />
FLOOD WARNING SYSTEM</p>
<p>Leonid Lopatoukhin1<br />
, Alexander Boukhanovsky1<br />
, Anna<br />
Kalyuzhnaya1<br />
1<br />
ITMO University, Russia<br />
kalyuzhnaya.ann@gmail.com</p>
<p>Floods are one of the most widely distributed natural disasters to life<br />
and property in the world. Coastal floods hazard is extremely important<br />
issue for many cities with coastal urban area, one of them is St.<br />
Petersburg. Flood risk assessment involves two main classes of tasks.<br />
The first class analyzes feasible flood damage in the conditions when the<br />
barrier system has inoperable state and therefore there is no way to<br />
control flood flowing. In this case we use historical data and assessment<br />
methods based on principles of extreme value theory. Also for predicted<br />
flood that might happen in the nearest time we execute an ensemble on<br />
variable input atmospheric data to estimate uncertainty of prediction<br />
models. The second class is connected with assessment of produced<br />
plans for sluice gate maneuvering. In this case flood evolvement can be<br />
controlled. Technical characteristics of the barrier system, model<br />
forecast and procedures of plan elaboration add uncertainty in final<br />
proposal for making decision phase. Thus the risk assessments also<br />
based on ensemble techniques can be useful to decrease possibility of<br />
unsafe plan selection. Additional approach for dealing with uncertainty<br />
connected with upcoming flood situation is creation a synthetic<br />
forecasts as probable scenarios for synoptic situations evolution. A<br />
combination of two approaches based on the stochastic model for<br />
multivariate extremes and and the synthetic storm model was applied<br />
for coastal floods reconstruction. </p>
]]></content:encoded>
			<wfw:commentRss>https://www.emecs.or.jp/en/emecs11-conference/emecs11-ab-02/11-14-2-49/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
