<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>International Center for EMECS &#187; The Kansai International Airport Project and Environmental Impact Assessment｜International Center for Environmental Management of Enclosed Coastal Seas</title>
	<atom:link href="https://www.emecs.or.jp/en/tag/minoru-maeda/feed" rel="self" type="application/rss+xml" />
	<link>https://www.emecs.or.jp/en</link>
	<description>he International EMECS Center is an organization established for promoting international exchanges on not only coastal but also catchment areas of the enclosed coastal seas in a wide range of fields such as research, policy, civic action, education and industrial activities and so forth to solve the problem on the environmental conservation of enclosed coastal seas in the world such as the Seto Inland Sea (Japan), the Chesapeake Bay (USA), the Baltic Sea (Northern Europe), and the Mediterranean Sea (Southern Europe).</description>
	<lastBuildDate>Tue, 13 Oct 2026 01:11:46 +0000</lastBuildDate>
	<language>ja</language>
		<sy:updatePeriod>hourly</sy:updatePeriod>
		<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=4.0.1</generator>
	<item>
		<title>The Kansai International Airport Project and Environmental Impact Assessment</title>
		<link>https://www.emecs.or.jp/en/emecs90-conference/emecs90-1-3/57-11</link>
		<comments>https://www.emecs.or.jp/en/emecs90-conference/emecs90-1-3/57-11#comments</comments>
		<pubDate>Fri, 03 Aug 1990 15:20:03 +0000</pubDate>
		<dc:creator><![CDATA[owner@emecs_or_jp]]></dc:creator>
				<category><![CDATA[Appropriate Use of Enclosed Coastal Seas]]></category>
		<category><![CDATA[Minoru Maeda]]></category>

		<guid isPermaLink="false">http://www.emecs.or.jp/en/?p=6739</guid>
		<description><![CDATA[The Kansai International Airport Project and Environmental Impact Assessment MINORU MAEDA Coordination Departm [&#8230;]]]></description>
				<content:encoded><![CDATA[<p>The Kansai International Airport<br />
Project and Environmental Impact<br />
Assessment<br />
MINORU MAEDA<br />
Coordination Department, Kansai International Airport Co., Ltd, 3-11-10 Minami-senba, Chuo-ku, Osaka, 542<br />
Japan<br />
Kansai International Airport is under construction in Osaka Bay,<br />
5 km off the coast of Senshu. The construction of seawal Is in the<br />
airport island conmenced in January, 1987. With the opening or the<br />
airport scheduled for the spring of 1993, the construction of aboveground<br />
faci I ities wi 11 soon begin.<br />
Construction of this airport, designed as a~ey international airport<br />
in Japan, is being carried out as a national project. In Osaka<br />
Bay, land reclamation is strictly controlled by provisions in the<br />
Special Law for Environmental Conservation in the Seto Inland Sea.<br />
Accordingly, special er.,phasis has been placed on preventing environmental<br />
pollution in and around Osaka Bay, and conserving the<br />
natura I env ir onment in prepar in g the ai r port pi an, as weI I as in<br />
assessing environmental impact prior to construction.<br />
This paper out I ines the environrr.ental impact assessment regarding<br />
construction of Kansai International Airport and environmental monitoring<br />
during construction, focusing on the impact on water qua-<br />
I ity.<br />
1. E nvi r onmenta I I中 actAssessment<br />
The outline of the airport proJect is shown in the attached Table.<br />
The environmental impact assessment was conducted in accordance<br />
with provisions in the Osaka Prefectural Government&#8217;s Ordinance<br />
and Techincal Guidelines .for environmental assessments. The scope<br />
of the prediction and assessment covered the impact of the construction,<br />
location and operation of the airport on the environment<br />
in and around Osaka Bay. The latest scientific findings were utilized<br />
for prediction. The assessment was conducted by comparing<br />
predicted results with the previously established targets for environmental<br />
conservation.<br />
1 .1 Environmental Impact Assessment of Airport Location and Operation<br />
The concentration of COD in drainage Basic Concept<br />
from the airport is very small (0.003<br />
ppm) at a location approximately 500 m<br />
from the airport,causing minimum change<br />
in COD concentration pattern in the<br />
sea area. As well, leads are small for<br />
other items affecting water quality.<br />
Accordingly, drainage from the airport<br />
will not have significant adverse effects<br />
vis-a-vis keeping down the concentration<br />
of pollutants in the sea area<br />
around the airport to meet environmental<br />
standards. As well, studies were<br />
made to predict the impact of the airport<br />
on the flow of seawater,waves and<br />
living things in the sea area. Predicted<br />
results showed that the impact on<br />
each of these factors is limited to<br />
the vicinity of the airport island.<br />
Other factors whose impacts were predieted<br />
and assessed through comparison<br />
with targets for environmental conservation<br />
include aircraft noise and pollutants<br />
emitted into the aュr.<br />
Marine Pollution Bulletin, Vol. 23, pp. 349-353, 1991.<br />
Printed in Great Britain<br />
0025-326X/91 $3.00+0.00<br />
c1991 Pergamon Press pie<br />
• Paying due and ful regard to pollution co介<br />
trol and environmental protection in Osaka<br />
Bay釦dits surrounding areas;<br />
• Serving as ahu b for domestic and international<br />
air transport;<br />
• Being open to traffic 24 hours ada y; and<br />
• Affording passengers and cargo ready<br />
access to the mainland for maximum<br />
convenience.<br />
Planning of the Airport (Phase 1)<br />
Location: Five kilometers offshore from the<br />
Senshu areain the southeastern part of Osaka<br />
Bay.<br />
Scale: One main runway 3,500 meters long<br />
in atot al area of 5.11 million square meters<br />
Capacity: Approximately 160,000 takeoffs<br />
and landings per year<br />
Access bridge: 3. 75 kilometers long providing<br />
both road and railway transportation<br />
Target date of airport opening: End of March,<br />
1993<br />
349<br />
1 .2 Environmental Impact Assessment<br />
In the course of airport island<br />
construction,soil improvement,seawall<br />
construction, land reclamation<br />
and aboveground facility construction<br />
will be carried out,in<br />
this order.Concurrently,the access<br />
bridge and railway will be constructed.<br />
Careful consideration has been<br />
given to preventing the adverse<br />
environmental effects of the airport<br />
project, with the goal of<br />
cr::-eating an airport free from environmental<br />
problems, that prospers<br />
with the local community.According<br />
to the plan, an area of<br />
511 ha (approximately 166 million<br />
m3 of soil) will be reclaimed in<br />
a sea area with an average depth<br />
of 18m, on thick alluvial and diluvial<br />
clay layers. This large<br />
area will be reclaimed within only<br />
six years. Accordingly, it is<br />
important to minimize the impact<br />
of the construction on water quality,<br />
especially the increase in<br />
turbidity, in the surrounding sea<br />
area.<br />
Marine Pollution Bulletin<br />
of Airport Construction<br />
Potential Air Transport Volume<br />
Classification Based on 160,000 Takeoffs<br />
and Landings per Year<br />
International 19 9 million<br />
喜~E Passengers Domest,c 108 m ,lilon<br />
Total 30 7 m,llion<br />
&#8221; 届埒c Cargo (tons)<br />
lnlernational 1,170,000<br />
Domestic 220,000<br />
垣Total 1,390,000<br />
lnlernalional 356 (74)・<br />
喜足~ No of Ta keo ffs an d<br />
Domest,c 98<br />
Landings Per Day<br />
Total 454<br />
・No ol 1ake-olls and land,ngs pe, day lo, ca,go a<1c,ah<br />
Potential Volume of People and Cargo Entering and<br />
Exiting the Airport per Day<br />
Classification Based on 160,000 Takeoffs<br />
and Landings Per Year<br />
K0">o&#8217;,<br />
International Passengers 44,200<br />
Domestic Passengers 23,800<br />
&#8220;忌&#8217; lCa . Total Noo f Passengers 68,000<br />
虫0.. ゜〇 .,.,・・≪屡== P eople per Day<br />
Well-Wishers 51,500<br />
Airpo~Employees 58,700<br />
゜ヽ—]= Sight Seer 3,800<br />
＇ V1si1ors on Business 5,800 >O&#8221;&#8221;&#8216;<br />
Total Volume ol People 187,800<br />
・で-cc;c:,~0i w・OC -:> ~ c: C: Cargo<br />
lnle「nat,onal 2,400<br />
Domes1,c 600<br />
(tons per day)<br />
Total Volume of Cargo 3,000<br />
NOTE T,ans,1 p,,ssengc•s and ea,go a<a e,ciocled<br />
The prediction and assessment of the impact of airport construetion<br />
on turbidity was conducted using a three-layer model, which<br />
simulates conditions during seawall construction, land reclamation<br />
and access bridge construction, each at its most active stage.During<br />
seawall construction, land sand is laid on the sea bottom in<br />
an 18 m depth sea area,to improve the foundation prior to building<br />
seawalls with rubble-stones. While sand is laid in an area surrounded<br />
by roughly completed seawalls during reclamation, dumping of<br />
sand from barges is conducted without an enclosing structure during<br />
seawall construction, thus making the increase of turbidity in<br />
a wide area more probable. Accordingly, thorough studies were made<br />
to determine the volume of impurities in the water, their rate of<br />
settlement and other factors, prior to construction.<br />
Simulation results showed that the increase of turbidity in areas<br />
around the airport caused by construction of the airport island<br />
and the access bridge will be greater in the lower layer than in<br />
the middle layer,and greater in the middle layer than in the upper<br />
layer; that the maximum instantaneous concentration of additional<br />
impurities (SSJ will reach 2 mg/1 in areas at a distance of up to<br />
approximately 1 km from the construction site;and that the maximum<br />
ュnstantaneous concentration will reach 10 mg/1 only in areas in<br />
the immediate vicinity of the construction site. These findings<br />
lead to the conclusion that the impact of airport construction is<br />
small, and does not bring about significant changes in water quality<br />
in sea areas around the site.<br />
1.3 Measures "for Environmental <:::onservation<br />
To prevent noise pollution, the airport island is located 5 km off<br />
the coast. As well, the following measures for environmental conservation<br />
have been taken or are planned:<br />
(a) Measures to be・implemented a"fter airport completion include:<br />
Secondary treatment of drainage prior to discharge; utilization of<br />
part of the recycled water as flushing water after drainage treatment;<br />
and adoption of a wave absorption structure for part of the<br />
seawalls, to reduce the effect of seawall on waves.<br />
350<br />
Volume 23/1991/EMECS'90<br />
(b) Measures to be taken during construction include:<br />
The installation of covers to prevent the diffusion of impurities,<br />
if necessary, during dredging and reclamation for access bridge<br />
construction; the dumping of i:1oil after the rough completion of<br />
seawall, to control the increase of turbidity; the continuous or<br />
periodic monitoring of the diffusion of impurities and other environmental<br />
factors during construction, and the execution of necessary<br />
adjustments (in the timing of sand dumping etc.) if measurements<br />
exceed the previously established target values for turbidity<br />
control.<br />
2. Environmental Monitoring<br />
Items to be monitored include noise, ambient air quality and weather,<br />
water quality, bottom materials, life in sea area and marine<br />
phenomena. The monitoring period is categorized into the construction<br />
stage and the operation stage.<br />
2.1 Mor:1itorir:'g of Turbidity Increment Resulting from Construction<br />
Monitoring points were located on a 1-km radius circle, with the<br />
construction site as the center, based on the results of the environmental<br />
impact assessment. Turbidity measured at a monitoring<br />
point is comprised of that attributable to natural factors and turbidity<br />
resulting from airport construction. Accordingly, it is<br />
important to distinguish between these two types of turbidity in<br />
monitoring. To this end, background turbidity was measured at a<br />
location typical of this sea area with regard to turbidity-related<br />
conditions; this background turbidity is subtracted from turbidities<br />
measured at monitoring points. A location of 4 km from the<br />
airport island was chosen for measurement of background turbidity,<br />
so as to preclude the influence of airport construction.<br />
Measurement was conducted at a 1 m point under the sea surface to<br />
determine turbidity in the upper layer; at a 2 m point on the sea<br />
bottom to determine turbidity in the lower layer; and at a point<br />
midway between these two to determine turbidity in the middle layer.<br />
For monitoring, the light transmission method was adopted. The<br />
determination of turbidity from measurement of SS (incrganic suspension),<br />
though more accurate, was rejected as too time-consuming,<br />
as it involves the analysis of collected water, and therefore is<br />
subject to difficulties in obtaining results quickly for effective<br />
adjustment of the construction process. As well, the light transmission<br />
method is advantageous in that it is simple enough to allow<br />
frequent measurements during construction extending over several<br />
years. For on-the-spot measurement, multipurpose submersible<br />
instruments are used to measure not only turbidity, but water temperature,<br />
pH, salinity and DO, and thus obtain information on the<br />
general properties of the seawater. Measurements have also been<br />
conducted to determine other factors affecting water quality: Transparency,<br />
red tide and oil film. In addition to monitoring via<br />
on-the-spot measurement, regular monitoring of SS and VSS via collected<br />
water analysis has been conducted to determine the properties<br />
of suspension.<br />
The levels of suspension in the sea area varies widely with tidal<br />
and other natural and artificial factors. Accordingly, suspension<br />
must be monitored constantly for timely adjustment of the construction<br />
process, to prevent adverse effects of suspension on the surrounding<br />
sea area. To this end, on-the-spot monitoring is conductd<br />
daily using a special ship for water quality inspection.<br />
The results of monitoring were evaluated through the previously<br />
established targets in water quality control. According to these<br />
targets, adjustment of the construction process will be made if<br />
the defference between the SS concentraion at a rr.onitoring point<br />
and the background SS concentration exceeds 10 mg/1 in a single<br />
measurement, or 2 rng/1 over three consecutive days. The basis for<br />
this is that, according to the results of water quality inspection<br />
prior to construction, the difference between the 55 concentration<br />
at a given location and that at another location rarely exceeds<br />
10 mg/1 in a single measurement, or 2 mg/1 for three consecu-<br />
351<br />
Marine Pollution Bulletin<br />
tive days. The SS concentration is determined by multiplying the<br />
turbidity obtained via on-the-spot measurement by a coefficient of<br />
1.3. This coefficient was determined as an average value, based<br />
on the relationship between turbidity and SS concentration obtained<br />
through water quality inspection prior to construction.<br />
2.2 Results of Turbidity Monitoring during Construction<br />
Some results of turbidity monitoring during construction are presented.<br />
These results were obtained from monitoring over two years<br />
from January 1987, when construction commenced, to December 1988,<br />
when the airport island seawall was roughly completed, and were<br />
obtained by monitoring 14 points 317 times (days) at each point in<br />
1987, 325 times in 1988.<br />
In 1987, abnormal values (values which exceeded the background<br />
concentration by more than 2 mg/1) were registered most middle<br />
frequently (217 times) for the upper layer, 84 times for the middle<br />
layer and 170 times for the lower layer. In 1988, the frequency<br />
for the upper layer decreased sharply to 84 times; that for the<br />
middle layer was 61 times, and that for the lower layer was 171<br />
times. The frequency for the lower layer was the highest among the<br />
frequencies for the three layers in 1988, remaining almost unchanged<br />
from the previous year. All of the five monitoring points, at<br />
which a sharp decrease in the frequency was registered in 1988,<br />
were located in an area near the access bridge construction site<br />
qn the land side of the airport island. It is assumed that the<br />
large decrease in frequency in 1988 was due to the difference between<br />
the red tide condition in 1987 and that in 1988. While the<br />
red tide in this sea area tended toward high concentration in a<br />
narrow area near the coast in 1987, it developed over a wider area<br />
in 1988. As the point at which the background concentration was<br />
measured was located on the periphery of the subject area for water<br />
quality monitoring, it is assumed that red tide, which formed<br />
in a narrow area along the coast, caused the abnormal values almast<br />
over the whole area.<br />
Frequencies of abnormal values for each cause of registration determined<br />
via daily monitoring, were 252 times for red tide, 124<br />
times for dragnets, 78 times for tidal influence, and 84 times for<br />
effluence of turbid water from the construction site. Criteria for<br />
determining the major causes of abnormal turbidity levels are outlined<br />
in the following, though these causes, with diverse contributing<br />
factors interacting in a complicated way, can be determined<br />
only on the basis of general judgements founded on empirical evidence.<br />
The existence of red tide in the upper layer is inferred from the<br />
characteristic change in water color, conspicuous DO supersaturation,<br />
high pH and other factors. For the middle layer, DO and pH<br />
values as high as those in the upper layer, in which red tide is<br />
observed, are used as indices of red tide. Results of previous research<br />
on red tide have also been used in establishing criteria.<br />
As for the roiling of the sea bottom by dragnets,it has been empirically<br />
established that, due to such roiling,turbidity in a relatively<br />
small layer on the sea bottom, up to several meters high,<br />
increases to an extremely high level, and that, in this layer,turbidity<br />
fluctuates widely during measurement. At on-the-spot measurements,<br />
data on dragnet fishery and tidal direction have also<br />
been used in determining the influence of such fishery.<br />
Data from May 2, 1988 serve as an example of the establishment of<br />
tidal influence. As a result of the weekly inspection, abnormal<br />
values were registered, in SS analysis for the lower layers at monitoring<br />
points A-8 and 17. At the time of inspection at A-8 and<br />
17, the southward current was gaining speed, while dragnet fishery<br />
, which causes a large increase of turbidity in the lower layer,<br />
was not conducted in the vicinity of the rnonioring points. Based<br />
on these facts, the cause of the abnormal SS concentration was determined<br />
to be roiling of the sea bottom by tidal currents.<br />
Data from April 18 and 19, 1987 serve to illustrate the effect of<br />
352<br />
Volume 23/1991/EMECS'90<br />
effluence of turbid water from the construction site. On these<br />
days, abnormal values were registered at monitoring point A-9, and<br />
change in water color was observed in an area extending from a large<br />
sand dumping operation in the sixth Seawall Construction Div.ision<br />
to the vicinity of A-9. In this and similar cases, in which<br />
water color change was observed in an area extending from the construction<br />
site to a monitoring point at which abnormal values were<br />
registered, the cause was determined to be the effluence of turbid<br />
water from the construction site.<br />
2. 3 AdjL1stment 1::>・f Construction Process<br />
Tidal current is a major factor related to the increase in turbi・ ―<br />
dity resulting from sand dumping. Accordingly, adju:;;tment of the<br />
construction process in response to tidal flow conditions is an<br />
effective and realistic measure for preventing increased turbiditurbidity<br />
due to airport construction. The adjustment was made<br />
ma.inly by modifying the timing of sand dumping.&#8217;That is, time required<br />
for the settlement and scattering of dumped sand (defined as a<br />
condition in which sand concentration has decreased to 2 mg/1) has<br />
been determined based on actual data. Sand dumping is suspended<br />
in a construction division during ti.mes in which tidal flow in the<br />
division is so rapid that time allowed for the settlement of sand<br />
may fall short of the requirement.<br />
Conclusion<br />
The Seto Inland Sea is one of the typical enclosed coastal seas of<br />
Japan. In part of this Inla.nd Sea off the coast of Senshu, the<br />
construction of an airport on an artificial island has been carried<br />
out at a rapid pace on a scale yet unseen in the world. This<br />
project represents a prime subject of discussion regarding development<br />
and its impact on the environment, and regarding the appropriate<br />
utilization of enclosed coastal seas, as it involves various<br />
types of prior environmental studies, environmental assessment based<br />
on the results of such studies, and environmental monitoring<br />
a.nd verification of the assessment during airport construction and<br />
operation.<br />
The above is only an outline of environmental assessment related<br />
to this project, and part. of the results of monitoring on turbidity.<br />
The author hopes to report on the details of other environmentally<br />
related aspects of the project, including verification of<br />
environmental assessment.<br />
This paper is based on the results of the author&#8217;s collaboration<br />
wit.h many individuals concerned, particularly employees of Kansai<br />
International Airport Co.,Ltd.in charge of environmental affairs.<br />
353</p>