<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>International Center for EMECS &#187; WASTE MINIMIZATION PROGRAM IN A SMALL-SCALE ELECTROPLATING FACTORY｜International Center for Environmental Management of Enclosed Coastal Seas</title>
	<atom:link href="https://www.emecs.or.jp/en/tag/suporn-koottatep/feed" rel="self" type="application/rss+xml" />
	<link>https://www.emecs.or.jp/en</link>
	<description>he International EMECS Center is an organization established for promoting international exchanges on not only coastal but also catchment areas of the enclosed coastal seas in a wide range of fields such as research, policy, civic action, education and industrial activities and so forth to solve the problem on the environmental conservation of enclosed coastal seas in the world such as the Seto Inland Sea (Japan), the Chesapeake Bay (USA), the Baltic Sea (Northern Europe), and the Mediterranean Sea (Southern Europe).</description>
	<lastBuildDate>Tue, 13 Oct 2026 01:11:46 +0000</lastBuildDate>
	<language>ja</language>
		<sy:updatePeriod>hourly</sy:updatePeriod>
		<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=4.0.1</generator>
	<item>
		<title>WASTE MINIMIZATION PROGRAM IN A SMALL-SCALE ELECTROPLATING FACTORY</title>
		<link>https://www.emecs.or.jp/en/emecs-97-conference/emecs97-2-9/138-7</link>
		<comments>https://www.emecs.or.jp/en/emecs-97-conference/emecs97-2-9/138-7#comments</comments>
		<pubDate>Sat, 09 Aug 1997 15:03:17 +0000</pubDate>
		<dc:creator><![CDATA[owner@emecs_or_jp]]></dc:creator>
				<category><![CDATA[Strategies and institutional arrangements for resolution of stakeholder conflicts in drainage basins and coastal sea]]></category>
		<category><![CDATA[Suporn Koottatep]]></category>

		<guid isPermaLink="false">http://www.emecs.or.jp/en/?p=5908</guid>
		<description><![CDATA[WASTE MINIMIZATION PROGRAM IN A SMALL-SCALE ELECTROPLATING FACTORY Supom Koottatcp, Associate Professor, Donde [&#8230;]]]></description>
				<content:encoded><![CDATA[<p>WASTE MINIMIZATION PROGRAM IN A SMALL-SCALE ELECTROPLATING<br />
FACTORY<br />
Supom Koottatcp, Associate Professor, Dondej Tungtalcanpoung, Graduate Student, Department<br />
of Env江onmentalEngineering, Fac~ty of Engineering, C出angMai University, Chaing Mai<br />
50200, Thailand.<br />
Wastewater from small-scale electroplating factories is one of the major issues of water quality<br />
problems in Thailand. High amounts of toxic metals are discharged daily into sewers and<br />
waterways without treatment. Most small-scale electroplating factories are in operation using<br />
simple and traditional technology of plating without pollution control facilities. As a result, high<br />
amounts of wastewater and heavymetal are threatening the environment. Operating conditions in<br />
most small-scale factories are very poor and could be a health hazard to their workers.<br />
The waste m血mization program of a selected small-scale electroplating factory was<br />
commissioned to test the feasibility of applying the program to improve the working conditions,<br />
reducing waste and using less resources of the factory.<br />
The fmdings of the project are:<br />
Environmental Auditing of the factory<br />
The selected factory consists of 8 workers including the owner. The factory gives services in Ni<br />
and Cr plating of car and motorcycle spareparts in the city of Chiang Mai. The factory is a small<br />
scale designed in a traditional way without engineering knowledge and proper management.<br />
Dirty floors are the result of poor house keeping and no employees were properly trained in<br />
plating. Layout of plant was poorly designed which make the flow of materials complicated and<br />
difficult. Wastewater were measured as shown in Table 1.<br />
Table 1. Wastewater generated from the factory (Before the program)<br />
Q (I/day) pH Ni (mg/I) Cr (mg/I) Remark<br />
acidic wastewater 37.6 0.87 0.07 0.06 165 work<br />
alkaline wastewater 157.0 7.77 1.5 0.1 pieces/month<br />
Ni wastewater 1340.0 6.34 99.2 7.4<br />
Cr wastewater 672.0 6.26 0.9 204.0<br />
Total 2206.6 Loss g/d 134.26 147.05<br />
396<br />
Wastewater disposed of by the factory was about 2,206 Vday. The Ni waste was about 1340 Vd<br />
with Ni concentration of 99. 2 mg/1 and Cr concentration of 7.4 mg/1. The Cr waste was about<br />
672 Vd with Cr concentration of 204.0 mg/1 and Ni concentration of 0.9 mg/1. The contamination<br />
of Ni in Cr waste and Cr in Ni waste could easily be seen which theoreticaly could be avoided.<br />
The acidic waste and alkaline waste were about 37.6 Vd and 157.0 Vd respectively. It was<br />
estimated that Ni and Cr loss through waste water were about 134.2 g/1 and 147.0 g/1<br />
respectively.<br />
Introducing Waste Minimization Program<br />
The waste minimization program was introduced in order to improve the situation. It is as<br />
follows:<br />
● To improve the working conditions and mixing of wastewater, layout of plant was adjusted<br />
according to process flow.<br />
● To reduce amount and concentration of wastewater in each stream, dragout tanks were added<br />
into the process.<br />
● To reduce the amount of wastewater, spraygun was used instead of open hose<br />
● To reduce wastewater end up on the floor, hangers were introduced<br />
● To ease wastewater treatment, facilities, waste were segregated through layout change.<br />
● A series of training programs were introduced to operators to show their way of operations<br />
compared to the proper one.<br />
The total cost of the program was about 100,000 Baht<br />
The Result After Adjustment<br />
The factory was monitored and the result of wastewater auditing was as shown in Table 2. After<br />
adjustment, wastewater was reduced to 357.4 1/d or about 83.8% reduction. Ni wastewater was<br />
reduced to 104.7 1/d with higher Ni concentration of 224 mg/I. Cr wastewater was reduced to<br />
195.7 mg/I with Cr concentration of 200 mg/I. There are insignificant amount of Ni in Cr waste<br />
and Cr in Ni waste.<br />
Table 2. Wastewater generated from the factory (After the program)<br />
Q (Vday) pH Ni (mg/1) Cr (mg/1) Remark<br />
acidic wastewater &#038; 57.0 5.12 0.04 0.02 271 work<br />
allcaline wastewater pieces/month<br />
Ni wastewater 104.7 5.78 224.0 0.08<br />
Cr wastewater 195.7 3.43 0.06 200.0<br />
Total 357.4 Loss g/d 23.48 39.09<br />
397<br />
Acidic and Alkaline wastewater were reduced to 57 .0 1/d without metal contamination. Ni and<br />
Cr loss were reduced to 23.48 g/d and 39.09 g/d respectively<br />
The economic evaluation was performed and it was found that the saving cost of water,<br />
chemicals and treatment was about 200 B/d. With the investment of I00 ,000 Baht for the<br />
program, the return period would be about 500 days (1.36 years).<br />
Suggestion for Further Implementation<br />
The result shows that the waste min血izationprogram is feasible for small scale plating factories<br />
in Thailand. However, there are still some barriers to the promotion of the activities. Small<br />
scale factories will not be able to pay for the consultant fees to perform the waste min血zation<br />
program since the program need time and qualified experts in assisting the program. Consultant<br />
frrms are also not interested in working for the small scale industry. The government should<br />
fmancially support the institutions and organizations such as universities or NGO s to do the job<br />
and to give free services to small scale industries in order to keep the environment clean and to<br />
save the country s resources.<br />
398</p>
]]></content:encoded>
			<wfw:commentRss>https://www.emecs.or.jp/en/emecs-97-conference/emecs97-2-9/138-7/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
