<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>International Center for EMECS &#187; Previous experience and prospects of using certain quantitative methods for the environmental assessment of hydraulic engineering constructions during the design process｜International Center for Environmental Management of Enclosed Coastal Seas</title>
	<atom:link href="https://www.emecs.or.jp/en/tag/zhigulsky-v-a/feed" rel="self" type="application/rss+xml" />
	<link>https://www.emecs.or.jp/en</link>
	<description>he International EMECS Center is an organization established for promoting international exchanges on not only coastal but also catchment areas of the enclosed coastal seas in a wide range of fields such as research, policy, civic action, education and industrial activities and so forth to solve the problem on the environmental conservation of enclosed coastal seas in the world such as the Seto Inland Sea (Japan), the Chesapeake Bay (USA), the Baltic Sea (Northern Europe), and the Mediterranean Sea (Southern Europe).</description>
	<lastBuildDate>Tue, 13 Oct 2026 01:11:46 +0000</lastBuildDate>
	<language>ja</language>
		<sy:updatePeriod>hourly</sy:updatePeriod>
		<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=4.0.1</generator>
	<item>
		<title>Previous experience and prospects of using certain quantitative methods for the environmental assessment of hydraulic engineering constructions during the design process</title>
		<link>https://www.emecs.or.jp/en/emecs11-conference/emecs11-13/11-13-5</link>
		<comments>https://www.emecs.or.jp/en/emecs11-conference/emecs11-13/11-13-5#comments</comments>
		<pubDate>Sun, 21 Aug 2016 15:00:50 +0000</pubDate>
		<dc:creator><![CDATA[owner@emecs_or_jp]]></dc:creator>
				<category><![CDATA[Sustainable use and development of coastal resources effective management and approaches]]></category>
		<category><![CDATA[Bylina, T. S.]]></category>
		<category><![CDATA[Maksimova, E. Y.]]></category>
		<category><![CDATA[Maksimova, T. V.]]></category>
		<category><![CDATA[Shuiskiy, V. F.]]></category>
		<category><![CDATA[Solovey, N. V.]]></category>
		<category><![CDATA[Zhigulsky, V. A.]]></category>

		<guid isPermaLink="false">https://www.emecs.or.jp/en/?p=1011</guid>
		<description><![CDATA[Previous experience and prospects of using certain quantitative methods for the environmental assessment of hy [&#8230;]]]></description>
				<content:encoded><![CDATA[<p>Previous experience and prospects of using<br />
certain quantitative methods for the environmental<br />
assessment of hydraulic engineering constructions<br />
during the design process<br />
August 22-27, 2016<br />
V.A. Zhigulsky, V.F. Shuiskiy, E.Y. Maksimova,<br />
T.S. Bylina, N.V. Solovey, T.V. Maksimova<br />
LLC &#8220;Eco-Express-Service&#8221;<br />
EMECS&#8217;11 SeaCoasts XXVI<br />
2<br />
Locations of Russian port complexes designed<br />
with the participation of LLC &#8220;Eco-Express-Service&#8221;<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
Port construction development<br />
in Eastern Gulf of Finland<br />
6337<br />
8146<br />
1419<br />
1455 974 921<br />
0<br />
1000<br />
2000<br />
3000<br />
4000<br />
5000<br />
6000<br />
7000<br />
8000<br />
9000<br />
3.1<br />
2.01<br />
2.9<br />
2.7<br />
2.38 2.41<br />
1.56<br />
1.83<br />
1.4 1.47<br />
1.85<br />
1.58<br />
1.53<br />
1.36<br />
1.2<br />
0<br />
0.5<br />
1<br />
1.5<br />
2<br />
2.5<br />
3<br />
3.5<br />
ИЗВ<br />
Dynamics of water pollution index in the<br />
Neva Bay (2000-2014)<br />
Dynamics of freight turnover of Russian ports in Baltic Sea<br />
according to Seaport Administration data, million tons<br />
3<br />
143.7 141.1<br />
163.4 172.3<br />
194.5<br />
215.8 223.5<br />
230.7<br />
0<br />
50<br />
100<br />
150<br />
200<br />
250<br />
2008 2010 2012 2014 2016 Годы<br />
Грузооборот, млн т/год<br />
Выборг<br />
Высоцк<br />
Усть-Луга<br />
Большой порт СПб<br />
Приморск<br />
Общий ВЧФЗ<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
Port “Bronka”<br />
Freight traffic activity, million tons per year<br />
Vyborg<br />
Vysotsk<br />
Ust-Luga<br />
Big port “St.Petersburg”<br />
Primorsk<br />
Total EGoF<br />
Years<br />
Dynamics of new territories’ formation: cumulative<br />
total area (S<br />
, ha) and dredging volume (V, million<br />
tons per year) in Eastern Gulf of Finland<br />
Average annual yield of fisheries<br />
in the Neva Bay (tons) (1972-2012)<br />
water pollution index<br />
4<br />
The structure of environmental costs (%%) in case of<br />
port complexes construction and exploitation<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
Average data of STP (sea trade port) Ust-Luga terminals<br />
Construction period Exploitation period<br />
Emissions<br />
Wastewaters<br />
Waste products<br />
Aquatic bioresources<br />
Average damage caused to aquatic bioresources<br />
of 195 projects total environmental costs<br />
Ratio of sediment pollution and contamination payments<br />
and damage to aquatic bioresources<br />
5<br />
Possible multicriteria measures<br />
(ranged according to complexity degree and entirety)<br />
1) The resulting and average weighted expert-rating scores (including or excluding a criteria of &#8220;weight<br />
coefficients&#8221;).<br />
2) Analogues of saprobity coefficients – similar to the structure of Pantle-Buck (Pantle, Buck, 1955),<br />
Sládeček (Sládeček, 1965) and Rotschein-Toderash (Rotschein-Toderash: Toderash, 1984) indexes:<br />
taking into account indicator values of characteristics, its &#8220;indicator weights&#8221; and measures of kurtosis.<br />
3) The isobolic method of the multifactor impact expected levels of compared alternatives on<br />
environment components evaluation.<br />
4) Classification multivariable techniques:<br />
● Direct comparison of Euclidean distances (or other measures of multivariable distances) in criteria<br />
hyperspace normalized with a uniform criteria trend (0 – optimum (natural or minimum transformed<br />
background) state, 1 – pessimal state):<br />
– expected distances between background and impact coordinates of compared alternatives in criteria<br />
hyperspace;<br />
– expected distances between impact coordinates of compared alternatives in criteria hyperspace.<br />
● Cluster analysis of results.<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
6<br />
Criterion group 1. Criteria involving technical and<br />
technological differences of the routing options.<br />
Criterion group 2. Criteria involving restrictions of<br />
natural resources management for each of the<br />
routing options.<br />
– fault risk;<br />
– sandbanks;<br />
– underwater ferromanganese concretions;<br />
– ice scouring;<br />
– underwater obstacles;<br />
– erosion by sea bottom currents;<br />
– hillslope processes;<br />
– navigation (routes, anchorages, traffic);<br />
– dangerous navigation zone;<br />
– military zones;<br />
– cables and pipelines to be crossed;<br />
– industrial fishing areas to be crossed;<br />
– land transport routes.<br />
Criterion group 3. Criteria involving the initial<br />
condition of the environment.<br />
– sea bottom soils;<br />
– dangerous exogenous geological processes;<br />
– marine environmental quality indicators;<br />
– characteristics of major hydrobiont communities.<br />
Criterion system for comparative environmental<br />
assessment of route options of maritime main piping<br />
designed by LLC &#8220;Eco-Express-Service&#8221;<br />
(in respect to the Gulf of Finland)<br />
13<br />
57<br />
89<br />
187<br />
44 1. Технические и технологические<br />
различия вариантов трасс<br />
2. Ограничения природопользования<br />
для вариантов трассы<br />
3. Исходное состояние окружающей<br />
среды<br />
4. воздействие на окружающую среду<br />
5. последствия возможных аварий<br />
Criteria (total amount – 390) are divided into 5 criterion groups:<br />
Criterion group 4. Criteria involving impact on the environment.<br />
– impact on landscapes and soils;<br />
– impact on atmosphere;<br />
– noise impact;<br />
– impact on abiotic aquatic environment;<br />
– damage to water bioresources;<br />
– impact on terrestrial biota;<br />
– damage to avifauna of offshore sections;<br />
– impact on marine mammals;<br />
– impact of wastes on the environment.<br />
Criterion group 5. Assessment of impact under accidents.<br />
– accidents during land sections construction;<br />
– accidental oil spill on water area during construction;<br />
– impact on atmosphere at water area accidents;<br />
– accidents at operation stage.<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
1. Technical and technological<br />
differences of the routing options<br />
2. Restrictions of natural resources<br />
management for routing options<br />
3. Initial condition of the environment<br />
4. Impact on the environment<br />
5. Impact under accidents<br />
7<br />
Multicriteria score/ranking comparative assessment<br />
of environmental hazard of the two route options<br />
Four competitive methods were used in order to combine the results obtained into an overall comparative score:<br />
Method 1. Scoring which does not involve weighting factors for the criteria, or the ratio factor for offshore/onshore<br />
sections of the route (if a routing option displays an advantage by any criterion, this scores one point for that routing<br />
option).<br />
Method 2. Scoring which does involve weighting factors for all the criteria but not the ratio factor for<br />
offshore/onshore sections of the route (this method is different in that various criteria are assigned different indicator<br />
roles, expressed by the corresponding weighting factor (W) – from 1 meaning a minimum to 5 &#8211; a maximum).<br />
Method 3. Scoring which does not involve weighting factors for the criteria but does involve the ratio factor for<br />
offshore/onshore sections of the route.<br />
● As with Method 1, the indicator role of every criteria is taken to be equal. However, this method also involves the<br />
ratio of the offshore section to its onshore section length.<br />
● A correction factor (L1), equal to the offshore section length as percentage of the total length of the Russian<br />
sector, is used for the criteria describing the offshore section of the route.<br />
● A correction factor (L2 = 1-L1), equal to the onshore section length as percentage of the total length of the<br />
Russian sector, is used for the criteria describing the onshore section of the route.<br />
Method 4. Scoring which involves weighting factors for all the criteria and the ratio factor for offshore/onshore<br />
sections of the route.<br />
● As with Method 2, various criteria are assigned different indicator roles, also expressed by the weighting index W<br />
with values of 1 to 5. Besides, this method also involves the ratio of the offshore section to its onshore section length L1<br />
and L2.<br />
● An advantage by any of the criteria scores a routing option is determined through multiplication of the<br />
corresponding weighting index W (from 1 to 5 points) and, correspondingly, L1 or L2<br />
, depending on whether that<br />
criterion is applied to the offshore or onshore section.<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
8<br />
The results of comparative assessment of environmental<br />
hazard of the two route options performed using four<br />
competitive methods<br />
● Resulting scores of both<br />
options and its ratio vary<br />
depending on the comparison<br />
method.<br />
● Differences of two compared<br />
options scores are less contrast<br />
when using the simplest method of<br />
points summing, excluding<br />
indicator value of each criteria.<br />
● Accounting of criteria<br />
diagnostic value differences using<br />
weighting factors obviously<br />
increases the ability to comparison:<br />
score ratio of estimates<br />
considerably increases.<br />
№<br />
№<br />
Comparative assessment method M-ment<br />
Unit Option A Option B Ratio A/B<br />
Best<br />
Option<br />
1 Scoring which does not involve<br />
weighting factors for the criteria,<br />
or the ratio factor for<br />
offshore/onshore sections of the<br />
route<br />
Points 213 109 1,95 A<br />
2 Scoring which does involve<br />
weighting factors for all the<br />
criteria but not the ratio factor<br />
for offshore/onshore sections of<br />
the route<br />
Points 877 408 2,15 A<br />
3 Scoring which does not involve<br />
weighting factors for the criteria<br />
but does involve the ratio factor<br />
for offshore/onshore sections of<br />
the route<br />
Points 182 77 2,36 A<br />
4 Scoring which involves weighting<br />
factors for all the criteria and the<br />
ratio factor for offshore/onshore<br />
sections of the route<br />
Points 758 290 2,61 A<br />
● Additional accounting of features share contribution characterizing offshore (expressed dominant) and onshore<br />
(relatively small) sections of the route shows these differences more clearly.<br />
● Nevertheless, significant nature protection benefits of option A are rather obvious in case of each of these four<br />
comparison methods application.<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
9<br />
Quantitative characteristics (environmental criteria)<br />
for comparative assessment of possible port locations<br />
using cluster analysis<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
Distance to the nearest residential constructions<br />
Land status<br />
The distance to the nearest nature reserve<br />
Total volume of dredging<br />
Volume of dredged grounds suitable for land filling<br />
Total volume of land reclamation<br />
Abandoned water area<br />
Annual sedimentation in port channel and operational waters<br />
Periodicity of required repair dredging<br />
Distance to the nearest habitats of protected species<br />
Distance to the nearest regular congregation of aquatic birds<br />
Distance to the nearest spawning area of valuable fish species<br />
Environmental payments during construction works<br />
Environmental payments during exploitation<br />
Damage to terrestrial and semi-aquatic organisms (including organisms of protected areas)<br />
Damage to water biological resources<br />
Euclidean distances between initial and expected state of the environment<br />
10<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
Cluster analysis of the aggregate<br />
characteristics of the environmental<br />
impact of four possible sea port locations<br />
Possible locations of deepwater port<br />
1- Gulf of Danzig<br />
2,3 – Sea coast bay<br />
4 – the North Cape, Balga<br />
11<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
 ( )   = = = =<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
= =   =  <br />
n<br />
i<br />
k<br />
j<br />
i i ij<br />
n<br />
i<br />
i i i<br />
n<br />
i<br />
R Ri U p U p<br />
1 1 1 1<br />
x x<br />
n – quantity of analyzed alternative scripts of environmentally hazard events<br />
caused by object impact;<br />
pij – probability of the i-th script realization from k subsequental events;<br />
Ri – probable environmental damage from realization i-th script in cost expression;<br />
Ui – full value of environmental damage in natural expression;<br />
xi – coefficient for conversion of damage in natural expression to cost expression<br />
with regard to concrete composition and structure of final recipients of the<br />
influence.<br />
impact environmental<br />
changes<br />
biotic<br />
reaction<br />
damage<br />
evaluation<br />
11 Damage U (traditional evaluation):<br />
2 Expected damage R (based on environmental risk analysis ):<br />
12<br />
The histogram of values of the probable damage<br />
caused by influence on the ecosystems of two objects<br />
(U, thousands roubles per year )<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
0,00<br />
0,05<br />
0,10<br />
0,15<br />
0,20<br />
0,25<br />
5,64<br />
5,70<br />
5,77<br />
5,83<br />
5,90<br />
5,96<br />
6,03<br />
6,09<br />
6,16<br />
6,22<br />
6,29<br />
6,35<br />
6,42<br />
6,49<br />
6,55 lg U<br />
Relative frequences, f<br />
f 1<br />
f 2<br />
f<br />
t 1<br />
f<br />
t 2<br />
2<br />
lg lg 0.5<br />
2<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
 <br />
 <br />
<br />
<br />
<br />
=<br />
<br />
 <br />
U U<br />
e<br />
N c<br />
f<br />
13<br />
a: alternative I-14 objects;<br />
b: alternative II -15 objects.<br />
Alternative allocation of Avantports<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
Scheme of the Avantports’ allocation<br />
Alternative I<br />
Scheme of the Avantports’ allocation<br />
Alternative II<br />
a b<br />
14<br />
Example of assessment of expected water area roiling zones as a result of<br />
dredging operations during Avantports construction at one of the alternatives<br />
concerning possible hydrometeorological conditions<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
Upper line of wildlife<br />
sanctuary Lebyazhie&#8221;<br />
Concentration of<br />
turbidity<br />
Malaja Izhora<br />
Bolshaja Izhora<br />
Lomonosov<br />
15<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process Dependence of total environmental payments<br />
(U) and damage to fishing industry (Uf<br />
) from<br />
volume of soil extracted during dredging (V)<br />
16<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process Dependence of total environmental payments<br />
(U) and damage to fishing industry (Uf<br />
) from<br />
reclaimed territory area (S)<br />
17<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
Dependence of relative environmental payments’ value (U/V, U/S) from volume of<br />
soil extracted during dredging (V) and from reclaimed territory area (S)<br />
18<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process The histogram of relative environmental payments<br />
(U/V, roubles per m3<br />
; U/S, roubles per m2<br />
)<br />
U/V  33 ± 5 RUB/m3<br />
U/S  179 ± 44 RUB/m2<br />
Classification of hydroconstruction impact on the environment:<br />
1) Low impact :<br />
U/V< 0,1 €/m3<br />
;<br />
U/S < 0,1 €/m2<br />
2) Moderate impact :<br />
0,1≤ U/V< 1,0 €/m3<br />
;<br />
0,1 ≤ U/S < 1,0 €/m2<br />
3) Significant impact :<br />
1 ≤ U/V< 10 €/m3<br />
;<br />
1 ≤ U/S < 10 €/m2<br />
4) Intensive impact :<br />
U/V ≥10 €/m3<br />
;<br />
U/S ≥ 10 €/m2<br />
U/V and U/S &#8211; environmental costs per unit volume of soil and formed territory.<br />
19<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
Opportunities to reduce environmental hazards of port development<br />
by regulating the environmental risk at the pre-stage<br />
U/V= 0,7 €/m3<br />
U/S= 3,7 €/m3<br />
20<br />
Examples of the maximum possible values of the relative<br />
environmental costs per unit of created territory (U/S, RUB/m2<br />
)<br />
determined by current speed (v, m/s) and average particle size (d,<br />
mm). Contour curves (according to data marked in red) are<br />
approximated by equations.<br />
ln(U/S)max d = (6,207±0,211) – (7,17±0,90)×d; r=0,97<br />
(U/S)max d = (496±116) × e<br />
–(7,17±0.90)×d<br />
d –mean particle size<br />
Correction of predicted environmental payments values after hydraulic works<br />
according to imperative environmental factors<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
lg(U/S)max v = (3,579±0,095) + (1,191±0,074)×v;<br />
r=0,96<br />
(U/S)max v = (3796±926) × v<br />
(1,191±0,074)<br />
v – mean current speed<br />
Thank you for your attention!<br />
LLC &#8220;Eco-Express-Service&#8221;<br />
195112, St. Petersburg,<br />
Zanevsky pr., 32/3<br />
Tel. (812) 574-5791<br />
Fax (812) 574-5794<br />
ecoplus@ecoexp.ru, www.ecoexp.ru<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process </p>
]]></content:encoded>
			<wfw:commentRss>https://www.emecs.or.jp/en/emecs11-conference/emecs11-13/11-13-5/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Previous experience and prospects of using certain quantitative methods for the environmental assessment of hydraulic engineering constructions during the design process</title>
		<link>https://www.emecs.or.jp/en/emecs11-conference/emecs11-13/11-13-3</link>
		<comments>https://www.emecs.or.jp/en/emecs11-conference/emecs11-13/11-13-3#comments</comments>
		<pubDate>Sun, 21 Aug 2016 15:00:29 +0000</pubDate>
		<dc:creator><![CDATA[owner@emecs_or_jp]]></dc:creator>
				<category><![CDATA[Sustainable use and development of coastal resources effective management and approaches]]></category>
		<category><![CDATA[Bylina, T. S.]]></category>
		<category><![CDATA[Maksimova, E. Y.]]></category>
		<category><![CDATA[Maksimova, T. V.]]></category>
		<category><![CDATA[Shuiskiy, V. F.]]></category>
		<category><![CDATA[Solovey, N. V.]]></category>
		<category><![CDATA[Zhigulsky, V. A.]]></category>

		<guid isPermaLink="false">https://www.emecs.or.jp/en/?p=1007</guid>
		<description><![CDATA[Previous experience and prospects of using certain quantitative methods for the environmental assessment of hy [&#8230;]]]></description>
				<content:encoded><![CDATA[<p>Previous experience and prospects of using<br />
certain quantitative methods for the environmental<br />
assessment of hydraulic engineering constructions<br />
during the design process<br />
August 22-27, 2016<br />
V.A. Zhigulsky, V.F. Shuiskiy, E.Y. Maksimova,<br />
T.S. Bylina, N.V. Solovey, T.V. Maksimova<br />
LLC &#8220;Eco-Express-Service&#8221;<br />
EMECS&#8217;11 SeaCoasts XXVI<br />
2<br />
Locations of Russian port complexes designed<br />
with the participation of LLC &#8220;Eco-Express-Service&#8221;<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
Port construction development<br />
in Eastern Gulf of Finland<br />
6337<br />
8146<br />
1419<br />
1455 974 921<br />
0<br />
1000<br />
2000<br />
3000<br />
4000<br />
5000<br />
6000<br />
7000<br />
8000<br />
9000<br />
3.1<br />
2.01<br />
2.9<br />
2.7<br />
2.38 2.41<br />
1.56<br />
1.83<br />
1.4 1.47<br />
1.85<br />
1.58<br />
1.53<br />
1.36<br />
1.2<br />
0<br />
0.5<br />
1<br />
1.5<br />
2<br />
2.5<br />
3<br />
3.5<br />
ИЗВ<br />
Dynamics of water pollution index in the<br />
Neva Bay (2000-2014)<br />
Dynamics of freight turnover of Russian ports in Baltic Sea<br />
according to Seaport Administration data, million tons<br />
3<br />
143.7 141.1<br />
163.4 172.3<br />
194.5<br />
215.8 223.5<br />
230.7<br />
0<br />
50<br />
100<br />
150<br />
200<br />
250<br />
2008 2010 2012 2014 2016 Годы<br />
Грузооборот, млн т/год<br />
Выборг<br />
Высоцк<br />
Усть-Луга<br />
Большой порт СПб<br />
Приморск<br />
Общий ВЧФЗ<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
Port “Bronka”<br />
Freight traffic activity, million tons per year<br />
Vyborg<br />
Vysotsk<br />
Ust-Luga<br />
Big port “St.Petersburg”<br />
Primorsk<br />
Total EGoF<br />
Years<br />
Dynamics of new territories’ formation: cumulative<br />
total area (S<br />
, ha) and dredging volume (V, million<br />
tons per year) in Eastern Gulf of Finland<br />
Average annual yield of fisheries<br />
in the Neva Bay (tons) (1972-2012)<br />
water pollution index<br />
4<br />
The structure of environmental costs (%%) in case of<br />
port complexes construction and exploitation<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
Average data of STP (sea trade port) Ust-Luga terminals<br />
Construction period Exploitation period<br />
Emissions<br />
Wastewaters<br />
Waste products<br />
Aquatic bioresources<br />
Average damage caused to aquatic bioresources<br />
of 195 projects total environmental costs<br />
Ratio of sediment pollution and contamination payments<br />
and damage to aquatic bioresources<br />
5<br />
Possible multicriteria measures<br />
(ranged according to complexity degree and entirety)<br />
1) The resulting and average weighted expert-rating scores (including or excluding a criteria of &#8220;weight<br />
coefficients&#8221;).<br />
2) Analogues of saprobity coefficients – similar to the structure of Pantle-Buck (Pantle, Buck, 1955),<br />
Sládeček (Sládeček, 1965) and Rotschein-Toderash (Rotschein-Toderash: Toderash, 1984) indexes:<br />
taking into account indicator values of characteristics, its &#8220;indicator weights&#8221; and measures of kurtosis.<br />
3) The isobolic method of the multifactor impact expected levels of compared alternatives on<br />
environment components evaluation.<br />
4) Classification multivariable techniques:<br />
● Direct comparison of Euclidean distances (or other measures of multivariable distances) in criteria<br />
hyperspace normalized with a uniform criteria trend (0 – optimum (natural or minimum transformed<br />
background) state, 1 – pessimal state):<br />
– expected distances between background and impact coordinates of compared alternatives in criteria<br />
hyperspace;<br />
– expected distances between impact coordinates of compared alternatives in criteria hyperspace.<br />
● Cluster analysis of results.<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
6<br />
Criterion group 1. Criteria involving technical and<br />
technological differences of the routing options.<br />
Criterion group 2. Criteria involving restrictions of<br />
natural resources management for each of the<br />
routing options.<br />
– fault risk;<br />
– sandbanks;<br />
– underwater ferromanganese concretions;<br />
– ice scouring;<br />
– underwater obstacles;<br />
– erosion by sea bottom currents;<br />
– hillslope processes;<br />
– navigation (routes, anchorages, traffic);<br />
– dangerous navigation zone;<br />
– military zones;<br />
– cables and pipelines to be crossed;<br />
– industrial fishing areas to be crossed;<br />
– land transport routes.<br />
Criterion group 3. Criteria involving the initial<br />
condition of the environment.<br />
– sea bottom soils;<br />
– dangerous exogenous geological processes;<br />
– marine environmental quality indicators;<br />
– characteristics of major hydrobiont communities.<br />
Criterion system for comparative environmental<br />
assessment of route options of maritime main piping<br />
designed by LLC &#8220;Eco-Express-Service&#8221;<br />
(in respect to the Gulf of Finland)<br />
13<br />
57<br />
89<br />
187<br />
44 1. Технические и технологические<br />
различия вариантов трасс<br />
2. Ограничения природопользования<br />
для вариантов трассы<br />
3. Исходное состояние окружающей<br />
среды<br />
4. воздействие на окружающую среду<br />
5. последствия возможных аварий<br />
Criteria (total amount – 390) are divided into 5 criterion groups:<br />
Criterion group 4. Criteria involving impact on the environment.<br />
– impact on landscapes and soils;<br />
– impact on atmosphere;<br />
– noise impact;<br />
– impact on abiotic aquatic environment;<br />
– damage to water bioresources;<br />
– impact on terrestrial biota;<br />
– damage to avifauna of offshore sections;<br />
– impact on marine mammals;<br />
– impact of wastes on the environment.<br />
Criterion group 5. Assessment of impact under accidents.<br />
– accidents during land sections construction;<br />
– accidental oil spill on water area during construction;<br />
– impact on atmosphere at water area accidents;<br />
– accidents at operation stage.<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
1. Technical and technological<br />
differences of the routing options<br />
2. Restrictions of natural resources<br />
management for routing options<br />
3. Initial condition of the environment<br />
4. Impact on the environment<br />
5. Impact under accidents<br />
7<br />
Multicriteria score/ranking comparative assessment<br />
of environmental hazard of the two route options<br />
Four competitive methods were used in order to combine the results obtained into an overall comparative score:<br />
Method 1. Scoring which does not involve weighting factors for the criteria, or the ratio factor for offshore/onshore<br />
sections of the route (if a routing option displays an advantage by any criterion, this scores one point for that routing<br />
option).<br />
Method 2. Scoring which does involve weighting factors for all the criteria but not the ratio factor for<br />
offshore/onshore sections of the route (this method is different in that various criteria are assigned different indicator<br />
roles, expressed by the corresponding weighting factor (W) – from 1 meaning a minimum to 5 &#8211; a maximum).<br />
Method 3. Scoring which does not involve weighting factors for the criteria but does involve the ratio factor for<br />
offshore/onshore sections of the route.<br />
● As with Method 1, the indicator role of every criteria is taken to be equal. However, this method also involves the<br />
ratio of the offshore section to its onshore section length.<br />
● A correction factor (L1), equal to the offshore section length as percentage of the total length of the Russian<br />
sector, is used for the criteria describing the offshore section of the route.<br />
● A correction factor (L2 = 1-L1), equal to the onshore section length as percentage of the total length of the<br />
Russian sector, is used for the criteria describing the onshore section of the route.<br />
Method 4. Scoring which involves weighting factors for all the criteria and the ratio factor for offshore/onshore<br />
sections of the route.<br />
● As with Method 2, various criteria are assigned different indicator roles, also expressed by the weighting index W<br />
with values of 1 to 5. Besides, this method also involves the ratio of the offshore section to its onshore section length L1<br />
and L2.<br />
● An advantage by any of the criteria scores a routing option is determined through multiplication of the<br />
corresponding weighting index W (from 1 to 5 points) and, correspondingly, L1 or L2<br />
, depending on whether that<br />
criterion is applied to the offshore or onshore section.<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
8<br />
The results of comparative assessment of environmental<br />
hazard of the two route options performed using four<br />
competitive methods<br />
● Resulting scores of both<br />
options and its ratio vary<br />
depending on the comparison<br />
method.<br />
● Differences of two compared<br />
options scores are less contrast<br />
when using the simplest method of<br />
points summing, excluding<br />
indicator value of each criteria.<br />
● Accounting of criteria<br />
diagnostic value differences using<br />
weighting factors obviously<br />
increases the ability to comparison:<br />
score ratio of estimates<br />
considerably increases.<br />
№<br />
№<br />
Comparative assessment method M-ment<br />
Unit Option A Option B Ratio A/B<br />
Best<br />
Option<br />
1 Scoring which does not involve<br />
weighting factors for the criteria,<br />
or the ratio factor for<br />
offshore/onshore sections of the<br />
route<br />
Points 213 109 1,95 A<br />
2 Scoring which does involve<br />
weighting factors for all the<br />
criteria but not the ratio factor<br />
for offshore/onshore sections of<br />
the route<br />
Points 877 408 2,15 A<br />
3 Scoring which does not involve<br />
weighting factors for the criteria<br />
but does involve the ratio factor<br />
for offshore/onshore sections of<br />
the route<br />
Points 182 77 2,36 A<br />
4 Scoring which involves weighting<br />
factors for all the criteria and the<br />
ratio factor for offshore/onshore<br />
sections of the route<br />
Points 758 290 2,61 A<br />
● Additional accounting of features share contribution characterizing offshore (expressed dominant) and onshore<br />
(relatively small) sections of the route shows these differences more clearly.<br />
● Nevertheless, significant nature protection benefits of option A are rather obvious in case of each of these four<br />
comparison methods application.<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
9<br />
Quantitative characteristics (environmental criteria)<br />
for comparative assessment of possible port locations<br />
using cluster analysis<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
Distance to the nearest residential constructions<br />
Land status<br />
The distance to the nearest nature reserve<br />
Total volume of dredging<br />
Volume of dredged grounds suitable for land filling<br />
Total volume of land reclamation<br />
Abandoned water area<br />
Annual sedimentation in port channel and operational waters<br />
Periodicity of required repair dredging<br />
Distance to the nearest habitats of protected species<br />
Distance to the nearest regular congregation of aquatic birds<br />
Distance to the nearest spawning area of valuable fish species<br />
Environmental payments during construction works<br />
Environmental payments during exploitation<br />
Damage to terrestrial and semi-aquatic organisms (including organisms of protected areas)<br />
Damage to water biological resources<br />
Euclidean distances between initial and expected state of the environment<br />
10<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
Cluster analysis of the aggregate<br />
characteristics of the environmental<br />
impact of four possible sea port locations<br />
Possible locations of deepwater port<br />
1- Gulf of Danzig<br />
2,3 – Sea coast bay<br />
4 – the North Cape, Balga<br />
11<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
 ( )   = = = =<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
= =   =  <br />
n<br />
i<br />
k<br />
j<br />
i i ij<br />
n<br />
i<br />
i i i<br />
n<br />
i<br />
R Ri U p U p<br />
1 1 1 1<br />
x x<br />
n – quantity of analyzed alternative scripts of environmentally hazard events<br />
caused by object impact;<br />
pij – probability of the i-th script realization from k subsequental events;<br />
Ri – probable environmental damage from realization i-th script in cost expression;<br />
Ui – full value of environmental damage in natural expression;<br />
xi – coefficient for conversion of damage in natural expression to cost expression<br />
with regard to concrete composition and structure of final recipients of the<br />
influence.<br />
impact environmental<br />
changes<br />
biotic<br />
reaction<br />
damage<br />
evaluation<br />
11 Damage U (traditional evaluation):<br />
2 Expected damage R (based on environmental risk analysis ):<br />
12<br />
The histogram of values of the probable damage<br />
caused by influence on the ecosystems of two objects<br />
(U, thousands roubles per year )<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
0,00<br />
0,05<br />
0,10<br />
0,15<br />
0,20<br />
0,25<br />
5,64<br />
5,70<br />
5,77<br />
5,83<br />
5,90<br />
5,96<br />
6,03<br />
6,09<br />
6,16<br />
6,22<br />
6,29<br />
6,35<br />
6,42<br />
6,49<br />
6,55 lg U<br />
Relative frequences, f<br />
f 1<br />
f 2<br />
f<br />
t 1<br />
f<br />
t 2<br />
2<br />
lg lg 0.5<br />
2<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
 <br />
 <br />
<br />
<br />
<br />
=<br />
<br />
 <br />
U U<br />
e<br />
N c<br />
f<br />
13<br />
a: alternative I-14 objects;<br />
b: alternative II -15 objects.<br />
Alternative allocation of Avantports<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
Scheme of the Avantports’ allocation<br />
Alternative I<br />
Scheme of the Avantports’ allocation<br />
Alternative II<br />
a b<br />
14<br />
Example of assessment of expected water area roiling zones as a result of<br />
dredging operations during Avantports construction at one of the alternatives<br />
concerning possible hydrometeorological conditions<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
Upper line of wildlife<br />
sanctuary Lebyazhie&#8221;<br />
Concentration of<br />
turbidity<br />
Malaja Izhora<br />
Bolshaja Izhora<br />
Lomonosov<br />
15<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process Dependence of total environmental payments<br />
(U) and damage to fishing industry (Uf<br />
) from<br />
volume of soil extracted during dredging (V)<br />
16<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process Dependence of total environmental payments<br />
(U) and damage to fishing industry (Uf<br />
) from<br />
reclaimed territory area (S)<br />
17<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
Dependence of relative environmental payments’ value (U/V, U/S) from volume of<br />
soil extracted during dredging (V) and from reclaimed territory area (S)<br />
18<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process The histogram of relative environmental payments<br />
(U/V, roubles per m3<br />
; U/S, roubles per m2<br />
)<br />
U/V  33 ± 5 RUB/m3<br />
U/S  179 ± 44 RUB/m2<br />
Classification of hydroconstruction impact on the environment:<br />
1) Low impact :<br />
U/V< 0,1 €/m3<br />
;<br />
U/S < 0,1 €/m2<br />
2) Moderate impact :<br />
0,1≤ U/V< 1,0 €/m3<br />
;<br />
0,1 ≤ U/S < 1,0 €/m2<br />
3) Significant impact :<br />
1 ≤ U/V< 10 €/m3<br />
;<br />
1 ≤ U/S < 10 €/m2<br />
4) Intensive impact :<br />
U/V ≥10 €/m3<br />
;<br />
U/S ≥ 10 €/m2<br />
U/V and U/S &#8211; environmental costs per unit volume of soil and formed territory.<br />
19<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
Opportunities to reduce environmental hazards of port development<br />
by regulating the environmental risk at the pre-stage<br />
U/V= 0,7 €/m3<br />
U/S= 3,7 €/m3<br />
20<br />
Examples of the maximum possible values of the relative<br />
environmental costs per unit of created territory (U/S, RUB/m2<br />
)<br />
determined by current speed (v, m/s) and average particle size (d,<br />
mm). Contour curves (according to data marked in red) are<br />
approximated by equations.<br />
ln(U/S)max d = (6,207±0,211) – (7,17±0,90)×d; r=0,97<br />
(U/S)max d = (496±116) × e<br />
–(7,17±0.90)×d<br />
d –mean particle size<br />
Correction of predicted environmental payments values after hydraulic works<br />
according to imperative environmental factors<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process<br />
lg(U/S)max v = (3,579±0,095) + (1,191±0,074)×v;<br />
r=0,96<br />
(U/S)max v = (3796±926) × v<br />
(1,191±0,074)<br />
v – mean current speed<br />
Thank you for your attention!<br />
LLC &#8220;Eco-Express-Service&#8221;<br />
195112, St. Petersburg,<br />
Zanevsky pr., 32/3<br />
Tel. (812) 574-5791<br />
Fax (812) 574-5794<br />
ecoplus@ecoexp.ru, www.ecoexp.ru<br />
Previous experience and prospects of using certain quantitative<br />
methods for the environmental assessment of hydraulic<br />
engineering constructions during the design process </p>
]]></content:encoded>
			<wfw:commentRss>https://www.emecs.or.jp/en/emecs11-conference/emecs11-13/11-13-3/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
