<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>International Center for EMECS &#187; PREVIOUS EXPERIENCE AND PROSPECTS OF USING CERTAIN QUANTITATIVE METHODS FOR THE ENVIRONMENTAL ASSESSMENT OF HYDRAULIC ENGINEERING CONSTRUCTIONS DURING THE DESIGN PROCESS｜International Center for Environmental Management of Enclosed Coastal Seas</title>
	<atom:link href="https://www.emecs.or.jp/en/tag/zhigulsky-vladimir/feed" rel="self" type="application/rss+xml" />
	<link>https://www.emecs.or.jp/en</link>
	<description>he International EMECS Center is an organization established for promoting international exchanges on not only coastal but also catchment areas of the enclosed coastal seas in a wide range of fields such as research, policy, civic action, education and industrial activities and so forth to solve the problem on the environmental conservation of enclosed coastal seas in the world such as the Seto Inland Sea (Japan), the Chesapeake Bay (USA), the Baltic Sea (Northern Europe), and the Mediterranean Sea (Southern Europe).</description>
	<lastBuildDate>Tue, 13 Oct 2026 01:11:46 +0000</lastBuildDate>
	<language>ja</language>
		<sy:updatePeriod>hourly</sy:updatePeriod>
		<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=4.0.1</generator>
	<item>
		<title>PREVIOUS EXPERIENCE AND PROSPECTS OF USING CERTAIN QUANTITATIVE METHODS FOR THE ENVIRONMENTAL ASSESSMENT OF HYDRAULIC ENGINEERING CONSTRUCTIONS DURING THE DESIGN PROCESS</title>
		<link>https://www.emecs.or.jp/en/emecs11-conference/emecs11-09/11-9-195</link>
		<comments>https://www.emecs.or.jp/en/emecs11-conference/emecs11-09/11-9-195#comments</comments>
		<pubDate>Sun, 21 Aug 2016 15:00:55 +0000</pubDate>
		<dc:creator><![CDATA[owner@emecs_or_jp]]></dc:creator>
				<category><![CDATA[Papers]]></category>
		<category><![CDATA[Bylina, Tatjana]]></category>
		<category><![CDATA[Maksimova, Ekaterina]]></category>
		<category><![CDATA[Maksimova, Tatjana]]></category>
		<category><![CDATA[Shuisky, Vladimir]]></category>
		<category><![CDATA[Solovey, Natalia]]></category>
		<category><![CDATA[Zhigulsky, Vladimir]]></category>

		<guid isPermaLink="false">https://www.emecs.or.jp/en/?p=938</guid>
		<description><![CDATA[PREVIOUS EXPERIENCE AND PROSPECTS OF USING CERTAIN QUANTITATIVE METHODS FOR THE ENVIRONMENTAL ASSESSMENT OF HY [&#8230;]]]></description>
				<content:encoded><![CDATA[<p>PREVIOUS EXPERIENCE AND PROSPECTS OF USING CERTAIN<br />
QUANTITATIVE METHODS FOR THE ENVIRONMENTAL ASSESSMENT<br />
OF HYDRAULIC ENGINEERING CONSTRUCTIONS DURING THE<br />
DESIGN PROCESS<br />
Vladimir Zhigulsky, LLC &#8220;Eco-Express-Service&#8221;, Russia<br />
Vladimir Shuisky, LLC &#8220;Eco-Express-Service&#8221;, Russia<br />
Ekaterina Maksimova, LLC &#8220;Eco-Express-Service&#8221;, Russia<br />
Tatjana Bylina, LLC &#8220;Eco-Express-Service&#8221;, Russia<br />
Natalia Solovey, LLC &#8220;Eco-Express-Service&#8221;, Russia<br />
Tatjana Maksimova LLC &#8220;Eco-Express-Service&#8221;, Russia<br />
ecoplus@ecoexp.ru<br />
Below is a brief overview of several quantitative methods for selecting the locations of<br />
hydraulic engineering constructions (HEC) to minimize the related environmental costs. These<br />
methods were developed and tested by Eco-Express-Service, a company with over twenty<br />
years of experience in the industry and extensive expertise in designing HECs.<br />
We conduct the following:<br />
1) A multidimensional cluster analysis of the expected human impact;<br />
2) An assessment of the ecological-economic risk in the form of the expected value of the<br />
predicted harm to the environment;<br />
3) An express estimation of the expected “environmental cost” of construction activities.<br />
Each of these methods is justified, described and illustrated by a specific example. Their use<br />
allows to solve such important practical tasks as quantification, classification and the<br />
quantitative comparative assessment of the expected impact on the marine environment. This<br />
becomes especially important when choosing the optimal location for an HEC and<br />
implementing environmental safety measures.<br />
An important point is that all of these methods can be recommended for use as Marine Spatial<br />
Planning (MSP) “instruments”.<br />
Key words: hydraulic engineering works, dredging, land reclamation, aquatic ecosystem,<br />
manmade impact<br />
I. INTRODUCTION<br />
The current work presents some applicable examples of quantitative methods for the<br />
environmental assessment of hydraulic engineering constructions during design process. In order to<br />
find the solution for the task under the present-day conditions it is necessary to create and apply the<br />
quantitative analytical methods which consider the regularity of marine environmental reaction to<br />
multicomponent human impact.<br />
Here we use the experience of developing and applying such methods by the specialists of<br />
the largest ecologic and design company of the North-West of Russia &#8211; Eco-Express-Service, a<br />
company with over twenty years of experience in the industry and extensive expertise in designing<br />
hydraulic engineering constructions (HECs) in offshore areas [1].<br />
The present text describes the possibilities of use of only three such methods: a<br />
multidimensional cluster analysis, an assessment of the ecological-economic risks and an express<br />
estimation of the expected “environmental cost” of hydraulic construction activities.<br />
II. THE USE OF MULTIDIMENSIONAL CLUSTER ANALYSIS<br />
The HEC optimal location is selected considering a large amount of criteria of different<br />
dimensions. At the same time it is necessary to compare the alternative options both with one<br />
another and with the so-called “zero option” (in case of no interference and its impact on the further<br />
course of succession of the environment). The multidimensional cluster analysis successfully meets<br />
the logic of both tasks. Its use can be demonstrated by an example of selecting the deep-water port<br />
in Kaliningradskaya oblast judging from the results of multicriterion technical, environmental and<br />
economic assessment of the location alternatives (the preliminary off-design stage, 2008-2010).<br />
The creation of the deep-water hub port in Kaliningradskaya oblast is stipulated by the<br />
Federal Target Program “Development of Transport System of Russia”. The port is designed as a<br />
large transport and logistic hub, to be a most important element of the Russian transport system,<br />
providing for the trade-economic interests of Russia in the Baltic region. Feasibility of the large<br />
transport and logistic hub creation is conditioned by the tendency of growing cargo traffic in the<br />
Baltic region and geographic features of the selected territory for the port construction.<br />
The following options for the location of deep-water port were considered (Fig. 1):<br />
– option 1 – open coast of the Baltic sea;<br />
– option 2 – west coast of the Primorskaya bay;<br />
– option 3 – east coast of the Primorskaya bay;<br />
– option 4 – region of Severny cape on Balga peninsula.<br />
The comparative technical, environmental and economic analysis of alternative options has<br />
been implemented on the basis of multicriterion system. Its ecological part included the following<br />
quantitative factors of the environmental conditions and the expected impact on the environment:<br />
• Straight distance to the nearest residential area<br />
• Status of the land plot<br />
• Straight distance to the nearest specially protected natural reservation (SPNR)<br />
• Total amount of dredging<br />
• Volume of dredging soils suitable for territories creation<br />
• Total amount of land reclamation works<br />
• Square of the detached water area<br />
• Annual sedimentation in access channels and operational waters<br />
• Regularity of necessary repair dredging<br />
• Distance to the nearest inhabitation of specially protected species<br />
• Distance to the nearest regular accumulation of waterfowl and semi-aquatic birds<br />
• Distance to the nearest spawning areas of valuable fish species<br />
• Payments for the environmental negative impact during construction period<br />
• Payments for the environmental negative impact during operation period<br />
• Damage to terrestrial and semi-aquatic biota (including the one in SPNR)<br />
• Damage to water biological resources<br />
The results of the comparative assessment of four options in Euclidean space of these factors<br />
are given in dendrogram in Fig. 2.<br />
Euclidean distances among four options assessed by the sum of the abovementioned factors<br />
show that options 2, 3 and 4 are relatively similar in the level of total environmental impact, while<br />
option 1 is critically different (significant Euclidean distance from group of options 2-4).<br />
The dendrogram reveals that judging from the level of the expected environmental impact<br />
options 3 and 4 are the most similar, and option 1 is the most different from others.<br />
Fig. 1. Diagram of four alternative options of the deep-water hub port location<br />
in Kaniningradskaya oblast<br />
We can view the nearest Euclidean distance between borders of parts in multidimensional<br />
criteria space as the generalized measure of environmental impact in every port location’s option<br />
corresponding to the absence of the predicted impact (“zero option”) and implementation of this<br />
option of location.<br />
When comparing all four options with the “zero” one (i.e. non-interference into the control<br />
succession), all conservational quantitative criteria combined, the environmental impact of option 1<br />
is seen as the least intense, option 2 – the most intense, while options 3 and 4 occupy the medium<br />
position between them.<br />
Fig. 2. Results of cluster analysis of the combined characteristics of environmental impact by the<br />
deep-water port with four options of its location considered<br />
III. THE QUANTITATIVE ANALYSIS OF ECOLOGICAL-ECONOMIC RISK<br />
When assessing the expected consequences of the planned hydraulic engineering activities it<br />
is usual to consider one simplified scenario of ecologically hazardous events. The assessment<br />
includes a nominal solely possible degree of man-caused harm, as if determined by the impact. But<br />
in fact it is obvious that the development of ecologically hazardous events cannot be strictly<br />
determined in this case and is of probabilistic nature. So in order to predict and minimize the<br />
ecological consequences of both developing marine transport system the whole and its parts it is<br />
necessary to actively develop and introduce methodology and methods of quantitative analysis of<br />
ecological risk. It will provide the approach to regulating ecological risks of port construction on a<br />
grounded basis, and preventing excessive impact on aquatic ecosystems on the stage of pre-design<br />
and design solutions. At the same time, when choosing the risk measure it is important to consider<br />
that only the ecological damage – the cost equivalent of induced changes – can serve as a consistent<br />
quantitative characteristic of diverse negative consequences of impact on different environmental<br />
components. Accordingly, the assessment of human impact on the environment shall be of the<br />
probabilistically cost nature and consider both possibility of realization of negative consequences<br />
and their severity level.<br />
As for ecological risks’ assessment the quantitative probabilistically cost approach is viewed<br />
as the most relevant one, having become commonly used for the technological risk evaluation [2, 3<br />
etc.]. At the same time the value of ecological risk (R) conditioned by an ecologically hazardous<br />
event is interpreted as the mathematical expectation of ecological damage (U):<br />
R = p×U (1)<br />
p – probability of event realization resulting in damage U.<br />
If it is possible to allocate and quantitatively assess different scenarios of ecologically<br />
hazardous events, the tree of events is drawn up. The probabilities and full values of harm to the<br />
impact’s recipients in their monetary terms (U) shall be considered for each of the possible<br />
alternative events (or scenarios – a sequence of events). The probability of each ith independent<br />
scenario realization of ecologically hazardous events from n of potentially possible scenarios (pi) is<br />
defined in a multiplicative way:<br />
∏=<br />
=<br />
k<br />
j<br />
pi pij<br />
1 (2)<br />
pij – probability of ith scenario realization in every alternative situation of further events<br />
development providing k options.<br />
Expected damage R in monetary terms is defined as a sum of mathematical expectations of<br />
damage from realization of alternative scenarios of ecologically hazardous events as per formula:<br />
∑ ∑( ) ∑ ∏ = = = = <br />
<br />
<br />
<br />
<br />
<br />
<br />
 = = × = ×<br />
n<br />
i<br />
k<br />
j<br />
i ij<br />
n<br />
i<br />
i i<br />
n<br />
i<br />
R Ri U p U p<br />
1 1 1 1 (3)<br />
n – number of analyzed alternative scenarios of ecologically hazardous events caused by an<br />
impact of the object; Ri – probable ecological damage from realization of ith scenario in its monetary<br />
terms; Ui – full value of ecological damage in physical terms.<br />
As an example of using such approach in design of port complexes we can consider the<br />
Preliminary Environmental Impact Assessment (PEIA) of Avantports of the Grand Port of Saint<br />
Petersburg implemented by LLC Eco-Express-Service in 2008 [4]. According to the design<br />
specification two alternatives of future Avantports’ location were considered. In both cases the<br />
system of Avantports would have occupied a significant space – its objects embrace the southern<br />
part of Saint Petersburg Flood Prevention Facility Complex (FPFC), the coastline to the east, and<br />
according to one of the options – to the west of FPFC, the southern part of Kotlin Island.<br />
The expected environmental impact by the avantports system in both compared alternatives<br />
of ports’ location has been thoroughly comparatively assessed with the elements of risk-analysis.<br />
The major components of total value of ecological damage from hydraulic engineering activities are<br />
known to be conditioned by pollution and sediment spreading in water and co-occurring decrease of<br />
water biological resources. The theoretical basis for the calculative studies of expected dynamic of<br />
increased cloudiness is presented by synthesized system of two mathematical models: the adapted<br />
tree-dimensional thermohydrodynamical model and the model of spread and sedimentation of<br />
suspended particles of Princeton University, USA [5].<br />
Usually the expected damage to parts of the aquatic environment caused by sediment<br />
spreading and water pollution is assessed by the results of only one model. At the same time many<br />
modeling conditions for calculation are selected on a rather subjective basis; this fact significantly<br />
devaluates the result. But development of present PEIA included modeling of water muddiness for<br />
different variants of possible hydro-meteorological conditions for the period of implementation of<br />
works, taking into account the probabilistic realization of each. Consequently judging from the data<br />
analysis results of alternative scenarios of ecologically hazardous events’ development, the resultant<br />
assessment of damage to parts of aquatic environment was implemented as per formula (3).<br />
Eventually the value of ecological risk from muddiness and chemical pollution of water constituted<br />
505 million rubles as per the first option of port location and 501 million rubles as per the second<br />
one. The value of ecological risk for fish resources constituted 523 and 497 million rubles<br />
accordingly.<br />
The results of thorough comparative assessment of ecological hazard of port location’s<br />
alternative options allowed giving grounds to recommend the second option – with partial carryover of port objects to the west of FPFC. It allowed preserving the group of regional nature reserves<br />
being designed (now acting) between “Bronka” port and the city of Lomonosov and at the same<br />
time remaining within the limits of acceptable impact on the existing SPNR – nature reserve<br />
&#8220;Lebyazhye&#8221;.<br />
Thus the suggested approach to assessment and regulation of ecological risk associated with<br />
the development of marine territory shows vivid benefits compared to the traditional “one-scenario”<br />
assessment. Calculation of supposedly sole value of future damage determined by an impact is<br />
substituted by an analysis of a tree of possible ecologically hazardous events taking into account the<br />
probability and cost of consequences of each scenario. This method is more reasonable, realistic and<br />
allowing making quantitatively grounded design and management solutions.<br />
IV. THE EXPRESS ESTIMATION OF THE EXPECTED “ENVIRONMENTAL COST” OF DESIGN<br />
It is obvious that the scope of future human environmental impact of the planned hydraulic<br />
engineering activities is largely predetermined during pre-design stage while selecting the variant of<br />
alternative design solutions. The analysis of numerous design and monitoring works by EcoExpress-Service Company associated with marine HECs erection allowed us developing and<br />
offering quite a simple method of indicative predictive estimation of ecological hazard of the<br />
planned hydraulic engineering activities during the pre-design stage. Within the present work it is<br />
easier to demonstrate the method on the basis of the sum of hydraulic engineering objects in the<br />
Gulf of Finland of the Baltic Sea.<br />
The method is based on revealed regularities of the following indices’ correlation.<br />
1. Impact level indices:<br />
V (million m3<br />
) – volume of soil removed during dredging.<br />
S (km2<br />
) – square of the created territory.<br />
2. Absolute indices of final environmental changes:<br />
UV (thousand of rubles or thousand of €) – the total amount of payment for the impact on all<br />
environmental components (according to the applicable law) during dredging (hereinafter referred to<br />
as &#8220;environmental cost&#8221; of dredging).<br />
US (thousand of rubles or thousand of €) – the total amount of payment for the impact on all<br />
environmental components (according to the applicable law) during territory creation (land<br />
reclamation) (hereinafter referred to as &#8220;environmental cost&#8221; of territory creation).<br />
As water biological resources are the main and most vulnerable recipient of human impact as<br />
well as the most important component of ecological damage during hydraulic engineering activities,<br />
the following indices are estimated separately:<br />
UfV and UfS (thousand of rubles or thousand of €) – value of compensatory payment for the<br />
damage of water biological resources during dredging and land reclamation accordingly.<br />
3. Relative indices of environmental changes<br />
1) Uv/V (rub/m3<br />
, €/m3<br />
) – &#8220;environmental cost&#8221; of a removed soil volume unit (hereinafter<br />
referred to as &#8220;relative environmental cost&#8221; of dredging);<br />
2) US/S (thousand rubles/km2 or rub/m2<br />
, thousand €/km2 or €/m2<br />
) – &#8220;environmental cost&#8221; of<br />
a created territory square unit (hereinafter &#8220;relative environmental cost&#8221; of territory creation).<br />
3) Ufv/V (rub/m3<br />
, €/m3<br />
) – damage to water biological resources caused by dredging per<br />
removed soil volume unit.<br />
4) UfS/S (thousand rubles/km2 or rub/m2<br />
, thousand €/km2 or €/m2<br />
) – damage to water<br />
biological resources caused by territory creation per its square unit.<br />
4. Dependencies of absolute values of environmental change from impact level values<br />
For the summary of objects considered one reveals the direct dependency of absolute indices<br />
of environmental change in monetary terms (UV and US) from the volume of removed soil (V) and<br />
total square of created territory (S). Correlation of these indices is described by the following<br />
formulae (UV and US – thousand €, V – million m3<br />
, S – km2<br />
):<br />
lg Uv = (2.928 ± 0.135) + (0.715 ± 0.115) × lg V; r = 0.77 (4)<br />
lg Us = (2.764 ± 0.158) + (1.063 ± 0.163) × lg S; r = 0.89 (5)<br />
At the same time the value of compensatory payment for the water biological resources<br />
damage from dredging works UfV (thousand €) also demonstrated the significant dependency from<br />
the removed soil volume V (million m3<br />
), which is acceptably approximated by the following<br />
formula:<br />
lg Ufv = (2.465 ± 0.115) + (0.651 ± 0.098) × lg V; r = 0.79 (6)<br />
Dependency of the compensatory payment value for the water biological resources damage<br />
from new territories creation works UfS (thousand €) from their square S (km2<br />
) is described by the<br />
formula:<br />
lg Ufs = (2.073 ± 0.164) + (0.861 ± 0.165) × lg S; r = 0.84 (7)<br />
5. &#8220;Environmental cost&#8221; of dredging and territories creation works in different scopes<br />
When expressing indices of &#8220;relative environmental cost” in euro (Uv/V, €/m3 и US/S,<br />
thousand €/km2<br />
) their correlations with removed soil volume units V (million m3<br />
) and land<br />
reclamation square S (km2<br />
) are formalized as follows:<br />
lg (Uv / V) = (–0.072 ± 0.135) – (0.285 ± 0.115) × lg V; r = –0.42 (8)<br />
lg (Us / S) = (2.459 ± 0.192) + (0.001 ± 0.001) × lg S; r = 0.11 (9)<br />
Changes of indices of the water biological resources damage from dredging works per<br />
removed soil volume unit Uv/V (€/m3<br />
) in the studied range of removed soil volume V (million m3<br />
)<br />
are described by formula:<br />
lg (Ufv / V) = (–0.535 ± 0.115) – (0.348 ± 0.098) × lg V; r = –0.56 (10)<br />
Changes of indices of the water biological resources damage from territory creation per<br />
square unit Us/S (thousand €/km2<br />
) in the studied range of land reclamation square S (km2<br />
) are<br />
described by formula:<br />
lg (Ufs / S) = (2.073 ± 0.164) – (0.139 ± 0.165) × lg S; r = –0.25 (11)<br />
Thus it is obvious that dependency of used absolute indices of the final environmental<br />
changes (UV, US, UfV and UfS) from absolute indices of impact level (removed soil volume V,<br />
created territory square S) is reliable, positive and quite well formalized. Relative indices of<br />
environmental changes (UV/V, US/S, UfV/V and UfS/S) are randomly varied within the studied<br />
ranges of impact indices, their dependencies from the scope of hydraulic engineering works are not<br />
revealed. It allows defining (by its meaning) and using averaged values of the indices in<br />
approximate prognoses.<br />
It is revealed that distributions of values of all four abovementioned relative indices are<br />
characterized by the prominent positive asymmetry and acceptably approximated by the lognormal<br />
distribution [6]. Therefore it is the most correct way to express the mathematical expectations of<br />
these indices as logarithmic mean values:<br />
0.271<br />
0.196 0.700+ UV V = − ,<br />
0.082<br />
0.061 0.231+ U fV V = − (€/m3<br />
);<br />
0.279<br />
0.196 0.657+ = − U S S ,<br />
0.053 117 0.037 0. + U fS S = − (€/m2<br />
) (12)<br />
Subsequently if one multiplies these indices by the value of planned total soil volume<br />
removed during dredging or by the total square of created new territories, during pre-design stage it<br />
is possible to get the preliminary approximate prognosis of the value of ecological-economic<br />
damage associated with the hydraulic engineering works to be planned.<br />
Obviously the variability of real relative indices of environmental changes around these<br />
mean values is defined by a number of synergically correlating factors. For that reason each design<br />
can have the specified values of the indices (defined by the results of full cycle of environmental<br />
design documentation development) that differ from abovementioned mathematical expectations.<br />
Accordingly if the hydraulic engineering design is characterized by positive values of the<br />
abovementioned factors, its “relative environmental cost” will be lower than the expected average<br />
value, and vice versa. The results of the conducted analysis allowed offering the following<br />
classification of the expected environmental impact of the hydraulic engineering activities:<br />
1) Low impact: Uv/V< 0,1 €/m3<br />
; Us/S < 0,1 €/m2<br />
2) Mild impact: 0,1≤ Uv/V< 1,0 €/m3<br />
; 0,1 ≤ Us/S < 1,0 €/m2<br />
3) Significant impact: 1 ≤ Uv/V< 10 €/m3<br />
; 1 ≤ Us/S < 10 €/m2<br />
4) Intensive impact: Uv/V ≥10 €/m3<br />
; Us/S ≥ 10 €/m2<br />
The given regularities allow approximate predicting the mathematical expectation of<br />
ecological-economic damage by hydraulic engineering activities during pre-design stage as per its<br />
major characteristics – total volume of soils to be removed during dredging and the summary square<br />
of the newly created territories.<br />
V. CONCLUSION<br />
Development and approbation of the quantitative analytical methods system allows solving<br />
tasks of both environmental assessment of the hydraulic engineering constructions under design<br />
process and optimal distribution of different types of marine uses in space and time. The presented<br />
examples show some scope of a considerably natural quantification, classification and quantitative<br />
comparative assessment of planned impact on the marine environment.<br />
The described methods developed or adapted for solving the design tasks can be effectively<br />
used with minimum changes for solving similar tasks of Marine Spatial Planning as well, becoming<br />
a part of its quantitative instruments.<br />
Please find related publications on the Eco-Express-Service website:</p>
<p>http://ecoexp.ru/page/34.</p>
<p>VI. REFERENCES<br />
[1] V.A. Zhigulsky, V.F. Shuisky, Y.A. Shchashchaev, and T.S. Bylina, “LLC &#8220;EcoExpress-Service&#8221;: the experience of evaluation and prediction of impact on aquatic ecosystems as a<br />
result of hydraulic construction,” Pybookhrana Rossii, N 2 (6), pp. 42-47, 2011.<br />
[2] Safety manual “Approval of safety guidelines method for accident risk assessment<br />
for hazardous petroleum refining and petrochemical industry facilities,” (Rostekhnadzor Order N<br />
646 of December 27, 2013).<br />
[3] Safety manual “Method for accident risk analysis for hazardous industrial facilities of<br />
marine oil and gas complex,” (Rostekhnadzor Order N 364 of September 16, 2015).<br />
[4] Development program of the Avantports of the Saint Petersburg Grand Port. The<br />
preliminary assessment of environmental impact considering existing and future specially protected<br />
natural reservations. Volume 4, LLC “Eco-Express-Service”, 1998.<br />
[5] V.A. Zhigulsky and V.N. Konoplev, “Integrated technology for model studies in<br />
offshore,” Proceedings of international conference “Oil and gas of Arctic shelf”, Murmansk,<br />
November 12-14, 2008 – Murmansk: MMBI KNTS RAS, 2008. – Pp. 141-158.<br />
[6] V.A. Zhigulsky, V.F. Shuisky, and N.A. Solovey, “Method of predictive express<br />
estimation of environmental hazard of hydraulic engineering works,” Gidrotehnika, N 1(26), pp. 68-<br />
71, 2012.</p>
]]></content:encoded>
			<wfw:commentRss>https://www.emecs.or.jp/en/emecs11-conference/emecs11-09/11-9-195/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>O111. PREVIOUS EXPERIENCE AND PROSPECTS OF USING CERTAIN QUANTITATIVE METHODS FOR THE ENVIRONMENTAL ASSESSMENT OF HYDRAULIC ENGINEERING CONSTRUCTIONS DURING THE DESIGN PROCESS</title>
		<link>https://www.emecs.or.jp/en/emecs11-conference/emecs11-ab-02/11-14-2-112</link>
		<comments>https://www.emecs.or.jp/en/emecs11-conference/emecs11-ab-02/11-14-2-112#comments</comments>
		<pubDate>Sun, 21 Aug 2016 15:00:45 +0000</pubDate>
		<dc:creator><![CDATA[owner@emecs_or_jp]]></dc:creator>
				<category><![CDATA[02_Oral presentations]]></category>
		<category><![CDATA[Bylina, Tatjana]]></category>
		<category><![CDATA[Maksimova, Ekaterina]]></category>
		<category><![CDATA[Maksimova, Tatjana]]></category>
		<category><![CDATA[Shuisky, Vladimir]]></category>
		<category><![CDATA[Solovey, Natalia]]></category>
		<category><![CDATA[Zhigulsky, Vladimir]]></category>

		<guid isPermaLink="false">https://www.emecs.or.jp/en/?p=1264</guid>
		<description><![CDATA[EMECS 11 – Sea Coasts XXVI, August 22-27, 2016, St Petersburg, Russia 120 O111. PREVIOUS EXPERIENCE AND PROSPE [&#8230;]]]></description>
				<content:encoded><![CDATA[<p>EMECS 11 – Sea Coasts XXVI, August 22-27, 2016, St Petersburg, Russia<br />
120<br />
O111. PREVIOUS EXPERIENCE AND PROSPECTS OF USING CERTAIN<br />
QUANTITATIVE METHODS FOR THE ENVIRONMENTAL ASSESSMENT<br />
OF HYDRAULIC ENGINEERING CONSTRUCTIONS DURING THE<br />
DESIGN PROCESS<br />
Vladimir Zhigulsky1<br />
, Vladimir Shuisky1<br />
, Ekaterina Maksimova1<br />
,<br />
Tatjana Bylina1<br />
, Natalia Solovey1<br />
, Tatjana Maksimova1</p>
<p>1<br />
LLC &#8220;Eco-Express-Service&#8221;, Russia<br />
ecoplus@ecoexp.ru<br />
Below is a brief overview of several quantitative methods for selecting<br />
the locations of hydraulic engineering constructions (HEC) to minimize<br />
the related environmental costs. These methods were developed and<br />
tested by Eco-Express-Service, a company with over twenty years of<br />
experience in the industry and extensive expertise in designing HECs.<br />
We conduct the following:<br />
1) A multidimensional cluster analysis of the expected human impact;<br />
2) An assessment of the ecological-economic risk in the form of the<br />
expected value of the predicted harm to the environment;<br />
3) An express estimation of the expected “environmental cost” of<br />
construction activities.<br />
Each of these methods is justified, described and illustrated by a specific<br />
example. Their use allows to solve such important practical tasks as<br />
quantification, classification and the quantitative comparative<br />
assessment of the expected impact on the marine environment. This<br />
becomes especially important when choosing the optimal location for<br />
an HEC and implementing environmental safety measures.<br />
An important point is that all of these methods can be recommended<br />
for use as Marine Spatial Planning (MSP) “instruments”.</p>
]]></content:encoded>
			<wfw:commentRss>https://www.emecs.or.jp/en/emecs11-conference/emecs11-ab-02/11-14-2-112/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>ASSESSMENT OF THE SPATIOTEMPORAL DYNAMICS OF THE MACROPHYTE THICKET ECOSYSTEMS IN THE NEVA BAY AND THE ADJACENT WATERS OF THE EASTERN GULF OF FINLAND</title>
		<link>https://www.emecs.or.jp/en/emecs11-conference/emecs11-08/11-9-130</link>
		<comments>https://www.emecs.or.jp/en/emecs11-conference/emecs11-08/11-9-130#comments</comments>
		<pubDate>Sun, 21 Aug 2016 15:00:23 +0000</pubDate>
		<dc:creator><![CDATA[owner@emecs_or_jp]]></dc:creator>
				<category><![CDATA[ICM and Satoumi Special Session]]></category>
		<category><![CDATA[Maksimova, Ekaterina]]></category>
		<category><![CDATA[Shuisky, Vladimir]]></category>
		<category><![CDATA[Zhigulsky, Vladimir]]></category>

		<guid isPermaLink="false">https://www.emecs.or.jp/en/?p=810</guid>
		<description><![CDATA[ASSESSMENT OF THE SPATIOTEMPORAL DYNAMICS OF THE MACROPHYTE THICKET ECOSYSTEMS IN THE NEVA BAY AND THE ADJACEN [&#8230;]]]></description>
				<content:encoded><![CDATA[<p>ASSESSMENT OF THE SPATIOTEMPORAL DYNAMICS OF THE<br />
MACROPHYTE THICKET ECOSYSTEMS IN THE NEVA BAY AND THE<br />
ADJACENT WATERS OF THE EASTERN GULF OF FINLAND<br />
Ekaterina Maksimova, LLC &#8220;Eco-Express-Service&#8221;<br />
Vladimir Zhigulsky, LLC &#8220;Eco-Express-Service&#8221;<br />
Vladimir Shuisky, LLC &#8220;Eco-Express-Service&#8221;<br />
ecoplus@ecoexp.ru<br />
The macrophyte thicket ecosystems of higher aquatic vegetation in the Neva Bay (NB) and<br />
Eastern Gulf of Finland (EGoF) perform many important roles, including acting as the<br />
habitats, nesting sites and migration sites for aquatic and semi-aquatic birds, creating the<br />
specific conditions necessary for the spawning and growth of many species of fish, and taking<br />
part in the self-purification of the aquatic ecosystems. Many anthropogenic disturbances,<br />
hydraulic works in particular, have a significant negative impact on these macrophyte thicket<br />
ecosystems.<br />
In recent years, the active growth of a new type of macrophyte thicket has been observed in<br />
the NB. This is due to the aftereffects of the construction of the Saint Petersburg Flood<br />
Prevention Facility Complex (FPFC). It is quite likely that the total macrophyte thicket area in<br />
these waters is currently increasing.<br />
In the future, it will be necessary to assess the environmental impacts of the hydraulic works<br />
on the macrophyte thicket of the NB and EGoF, taking into account the background processes<br />
of the spatiotemporal dynamics of the reed beds in the waters in question. To do this, it will be<br />
necessary to carry out a comprehensive study of these ecosystems and identify patterns in<br />
their spatial and temporal dynamics. The program of the study has been developed and is<br />
currently being implemented by Eco-Express-Service, a St. Petersburg eco-design company.<br />
Key words: macrophyte thicket ecosystems, Neva Bay, Eastern Gulf of Finland, hydraulic<br />
engineering works, aquatic ecosystem, manmade impact, succession, environmental damage<br />
I. INTRODUCTION<br />
The macrophyte thicket ecosystems in the Neva Bay (NB) and Eastern Gulf of Finland<br />
(EGoF) are known for their high biodiversity and multifaceted role in the ecosystem. They serve as<br />
habitats, nesting grounds and migratory stopovers for aquatic and semi-aquatic birds, create<br />
favorable conditions for breeding, spawning and fattening of different fish species, actively<br />
participate in self-cleaning of water bodies, etc. [1,2 et al.]<br />
Hydraulic works often have a strong negative impact on these ecosystems. Increased water<br />
turbidity and subsequent sedimentation of suspended particles creates unfavorable conditions for<br />
aquatic biota by inhibiting aquatic macrophytes, destroying the spawning areas for fish and<br />
eliminating their forage reserve, leads to the loss of the nests and migratory sites of birds [3,4,5 et<br />
al.]. Public environmental impact assessments of hydraulic works that may affect on macrophyte<br />
thicket ecosystems often include requirements for compensatory measures aiming at restoring water<br />
macrophytes. Besides the conventional measures of protection for macrophyte thicket ecosystems,<br />
these requirements sometimes include artifical creation of new thickets by environmental<br />
engineering means.<br />
Some hydraulic works, however, lead to proliferation of new communities of water<br />
macrophytes. This was the case of construction of the dams of Saint Petersburg Flood Prevention<br />
Facility Complex (FPFC). Construction and maintenance of FPFC has had a major impact on the<br />
flow field of Neva Bay, has decreased the flow rate and increased sedimentation and shallowing<br />
processes, and has led to changes in shoreline and seabed profiles. These factors have favoured the<br />
increase in surface covered by macrophyte thicket ecosystems and occurrence of new thickets [2, 6<br />
et al.]. These processes are visible both in the NB and to the west from the FPFC dams, including<br />
both the shoreline and rapidly developing shallow areas far from the solid ground. Besides that, the<br />
dams themselves serve as artificial reefs with significant juvenile substrates, contribute to growth of<br />
macrophyte thicket ecosystems on the adjacent water surfaces that are characterized with high<br />
biodiversity levels [7].<br />
Thus, the overall surface of macrophyte thicket ecosystems in NB and EGoF may be steadily<br />
growing; however, exact data concerning this important process is still missing. Not only the overall<br />
balance of increases/decreases in projective cover of macrophyte thickets on the water surface is<br />
unknown, but also the ability of new aquatic macrophytes communities to fully compensate the<br />
ecological role of thickets lost because of recent hydraulic works remains unclear. Only fragmantary<br />
information exists on this account: according to anecdotal observations made by ornitologists, newly<br />
formed macrophyte thickets are actively used as stopovers by migratory birds. In general, however,<br />
their biochorological, phytocenological and hydrobiological characteristics, the quality of the abiotic<br />
environments formed by these thickets, the extent of their use by the fish population and birds<br />
remain practically unknown.<br />
Adequate evaluation of environmental consequences of local negative impact prodiced by<br />
hydraulic works can only be made in the context of longer-term processes of spaciotemporal<br />
dynamics of overflow lands in the whole NB and EGoF. A complex study of macrophyte thicket<br />
ecosystems of these waters is needed in order to find out the spaciotemporal dynamics patterns and<br />
provide better foundations for realistic environmental damage assessment of transportation or<br />
industrial hydraulic works.<br />
The program of such study was developed and currently is under implementation by “EcoExpress-Service”, a Saint-Petersburg-based environmental design company [8].<br />
A thorough and detailed study of all parcels of aquatic macrophyta is currently impossible;<br />
thus, the program combines large-scale general observations and detailed study of the most<br />
characteristic (model) parcels.<br />
II. MAIN COMPONENTS OF THE STUDY<br />
1) Comparative evaluation of spaciotemporal changes in NB and adjacent EGoF waters<br />
based on accumulated literary and graphic material, manuscripts and satellite imaging;<br />
&#8211; Definition and description of quantitative patterns of distribution, seasonal and long-term<br />
dynamics of projective cover.<br />
2) Selection of model parcels of macrophyte thicket ecosystems for detailed study according<br />
to their division into three categories by their stage of succession:<br />
I) Aged macrophyte thicket ecosystems with relatively stable projective cover and high level<br />
of biodiversity;<br />
II) Relatively unstable ecosystems that have appeared or substantially expanded/reduced<br />
their surface during the observation period before the construction of FPFC;<br />
III) Relatively recent communities formed as a result of artificial changes in hydrologic<br />
mode of the Neva bay.<br />
Every category is supposed to have four types of water surface parcels:<br />
a) surfaces unaffected by hydraulic works and minimally exposed to other anthropogenic factors<br />
(authentic state);<br />
b) surfaces outside the area of impact of hydraulic works exposed to moderate level of other<br />
anthropogenic factors (background state);<br />
c) surfaces situated in the impact zone of hydraulic works and exposed to moderate level of other<br />
anthropogenic factors (impacted state);<br />
d) macrophyte thicket ecosystems directly adjacent to FPFC, whose development is determined by<br />
its influence.<br />
Thus, the selection of model parcels is presumed to reflect characteristic situations in each of<br />
the following 12 types:<br />
Ia, Ib, Ic, Id;<br />
IIa, IIb, IIc, IId;<br />
IIIa, IIIb, IIIc, IIId.<br />
3) Primary complex study of chosen model parcels of macrophyte thicket ecosystems in NB<br />
and adjacent EGoF, including the characteristics of abiotic environment, aquatic biota, fishery and<br />
ornithologic importance (2016 growing season).<br />
4) If needed, corrections in selected model parcels can be made according to the results of<br />
primary assessment in order to achieve better correspondence to preset types of conditions (2016 fall<br />
and winter).<br />
5) Organization and implementation of seasonal (phenological) and interannual dynamics<br />
monitoring of macrophyte thicket ecosystems on selected model parcels (the scheme of monitoring<br />
can be quickly optimized).<br />
Finding out patterns of spaciotemporal dynamics of these communities, abiotic conditions,<br />
and their biochorologic, fishery and ornithologic importance, including the following elements:<br />
&#8211; Estimating the redistribution of migratory birds across stopover sites, bird species<br />
composition and quantitative characteristics, estimating the real impact of specific overflow lands<br />
inhibition during hydraulic works compared to larger-scale dynamics of their development in the<br />
studied region;<br />
&#8211; Estimation of fishery importance of new macrophyte thicket ecosystems, including their<br />
suitability for breeding, spawning and fattening of fish, productivity of these communities, species<br />
composition of breeding and fattening fish, quality of fish, disease and survival rates of different fish<br />
species, and overall share of macrophyte thicket ecosystems in the reproduction of fish livestock in<br />
NB and EGoF.<br />
6) Statistical processing of obtained data and determining of key characteristics to be taken<br />
into account during the assessment of changes in macrophyte thicket ecosystems under the impact of<br />
hydraulic works in context of longer-term background processes.<br />
7) Developing proposals on improvement of technical and methodological documents that<br />
are used for environmental impact assessment in case of industrial/transportation hydraulic works<br />
that may affect aquatic macrophytes communities.<br />
8) Further environmental monitoring of model parcels according to the established scheme<br />
and based on information obtained during the previous stages of research.<br />
III. EXPECTED RESULTS OF RESEARCH PROGRAM IMPLEMENTATION<br />
1. Established and regularly updated data base on hydraulical, hydrochemical,<br />
phytocenological, hydrobiological, ichthyological and ornithological parameters of macrophyte<br />
thicket ecosystems in NB and adjacent EGoF;<br />
2. Proposals on improvement of technical and methodological documents on environmental<br />
impact assessment of hydraulic works on macrophyte thicket ecosystems of NB and adjacent EGoF,<br />
and estimation of environmental damage of such works considering the background dynamics;<br />
3. Developed methods of quantitative evaluation of compulsory compensation payments for<br />
negative biotic impact of hydraulic works affecting the macrophyte thicket ecosystems in NB and<br />
EGoF;<br />
4. Materials for including corresponding methods and clauses in environmental legislation;<br />
5. Established system of environmental monitoring of model parcels of macrophyte thicket<br />
ecosystems in Neva Bay and adjacent Eastern Gulf of Finland.<br />
IV. ACKNOWLEDGMENT<br />
The authors offer their thanks to the executive director of Fenix LLC A.E. Shukletsov and to<br />
chief ecologist of Fenix LLC O.V. Stepanov for their help in the organization of work and technical<br />
support.<br />
V. REFERENCES<br />
[1] I.L. Korelyakova, Macrophyta of eastern part of Gulf of Finland, Saint Petersburg,<br />
GosNIORKH, 1997, 158 pp.<br />
[2] Ecosystem of Neva estuary: biodiversity and environmental issues/ edited by A.F.<br />
Alimov and S.M. Golubkov. Moscow, KMK Scientific Editions Partnership, 2008, 477 pp.<br />
[3] O.N. Susloparova, T.V. Tereshenkova, A.A. Khozyaykin, J.A. Zuev, A.J. Tamulenis,<br />
D.S. Sendek, D.V. Bogdanov, and A.S. Shuruhin, “Estimation of negative impact consequences of<br />
technogenic loading on water biological resources of the Neva bay of the Gulf of Finland according<br />
to long-term monitoring,” XV International Environmental Forum “Baltic Sea Day”, SaintPetersburg: Rosvodresursy, 2014, pp. 234-235.<br />
[4] A.E. Rybalko, N.K. Fedorova, D.P. Fokin, V.M. Zaytsev, and I.M. Markovets,<br />
“Impact of large-scale hydraulic works on geo-ecological situation in Neva Bay and Eastern Gulf of<br />
Finland,” X International Environmental Forum “Baltic Sea Day”, Saint-Petersburg: LLC «MaxiPrint», 2009, pp. 196-198.<br />
[5] L.L. Sukhacheva, and M.I. Orlova, “Usage of satellite imaging of eastern part of Gulf<br />
of Finland for assessment of environmental impact of natural and anthropogenic factors on waters<br />
and biotic components of local ecosystem,” Regional ecology, 1-2 (35), pp. 62-76, 2014.<br />
[6] L.V. Zhakova, V.V. Drozdov, and D.A. Golubev, “Impact of hydraulic works and<br />
underwater ground storage on coastal macrophyte thicket ecosystems: example of Neva Bay,” Basic<br />
concepts of modern coastline use, Saint Petersburg, RGGMU, pp. 138-167, 2011.<br />
[7] N.P. Iovchenko, “The role of Saint Petersburg Flood Prevention Facility Complex in<br />
preservation of biodiversity and endangered bird species of the Baltic region,” Russian journal of<br />
Ornithology, vol. 21, Special issue No. 825, pp. 3125-3139, 2012.<br />
[8] V.A. Zhigulsky, V.F. Shuisky, Y.A. Shchashchaev, and T.S. Bylina, “LLC “EcoExpress-Service”: the experience of evaluation and prediction of impact on aquatic ecosystems as a<br />
result of hydraulic construction,” Fisheries preservation in Russia, №2 (6), pp. 42-47, 2011.</p>
]]></content:encoded>
			<wfw:commentRss>https://www.emecs.or.jp/en/emecs11-conference/emecs11-08/11-9-130/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>O084. ASSESSMENT OF THE SPATIOTEMPORAL DYNAMICS OF THE MACROPHYTE THICKET ECOSYSTEMS IN THE NEVA BAY AND THE ADJACENT WATERS OF THE EASTERN GULF OF FINLAND</title>
		<link>https://www.emecs.or.jp/en/emecs11-conference/emecs11-ab-02/11-14-2-86</link>
		<comments>https://www.emecs.or.jp/en/emecs11-conference/emecs11-ab-02/11-14-2-86#comments</comments>
		<pubDate>Sun, 21 Aug 2016 15:00:21 +0000</pubDate>
		<dc:creator><![CDATA[owner@emecs_or_jp]]></dc:creator>
				<category><![CDATA[02_Oral presentations]]></category>
		<category><![CDATA[Maksimova, Ekaterina]]></category>
		<category><![CDATA[Shuisky, Vladimir]]></category>
		<category><![CDATA[Zhigulsky, Vladimir]]></category>

		<guid isPermaLink="false">https://www.emecs.or.jp/en/?p=1210</guid>
		<description><![CDATA[EMECS 11 – Sea Coasts XXVI, August 22-27, 2016, St Petersburg, Russia 93 O84. ASSESSMENT OF THE SPATIOTEMPORAL [&#8230;]]]></description>
				<content:encoded><![CDATA[<p>EMECS 11 – Sea Coasts XXVI, August 22-27, 2016, St Petersburg, Russia<br />
93<br />
O84. ASSESSMENT OF THE SPATIOTEMPORAL DYNAMICS OF THE<br />
MACROPHYTE THICKET ECOSYSTEMS IN THE NEVA BAY AND THE<br />
ADJACENT WATERS OF THE EASTERN GULF OF FINLAND<br />
Ekaterina Maksimova1<br />
, Vladimir Zhigulsky1<br />
, Vladimir Shuisky1</p>
<p>1<br />
LLC &#8220;Eco-Express-Service&#8221;, Russia<br />
ecoplus@ecoexp.ru<br />
The macrophyte thicket ecosystems of higher aquatic vegetation in the<br />
Neva Bay (NB) and Eastern Gulf of Finland (EGoF) perform many<br />
important roles, including acting as the habitats, nesting sites and<br />
migration sites for aquatic and semi-aquatic birds, creating the specific<br />
conditions necessary for the spawning and growth of many species of<br />
fish, and taking part in the self-purification of the aquatic ecosystems.<br />
Many anthropogenic disturbances, hydraulic works in particular, have a<br />
significant negative impact on these macrophyte thicket ecosystems.<br />
In recent years, the active growth of a new type of macrophyte thicket<br />
has been observed in the NB. This is due to the aftereffects of the<br />
construction of the Saint Petersburg Flood Prevention Facility Complex<br />
(FPFC). It is quite likely that the total macrophyte thicket area in these<br />
waters is currently increasing.<br />
In the future, it will be necessary to assess the environmental impacts of<br />
the hydraulic works on the macrophyte thicket of the NB and EGoF,<br />
taking into account the background processes of the spatiotemporal<br />
dynamics of the reed beds in the waters in question. To do this, it will be<br />
necessary to carry out a comprehensive study of these ecosystems and<br />
identify patterns in their spatial and temporal dynamics. The program of<br />
the study has been developed and is currently being implemented by<br />
Eco-Express-Service, a St. Petersburg eco-design company.</p>
]]></content:encoded>
			<wfw:commentRss>https://www.emecs.or.jp/en/emecs11-conference/emecs11-ab-02/11-14-2-86/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
